Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18047
Well Classification: GW Status: PR - 2/16/2011
Well Name/No:FEDERAL #PA 433-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date2/16/2011
FacilityID:300848LocationID:335256
County:GARFIELD #045Location:NESW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:5839 ft.
Basin:PICEANCE BASIN  
Planned Location:2375FSL  2175 FWLLat/Long: 39.509011 / -108.005403Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.509011 / -108.005402Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/16/2011             Measured TD: 8706 ft.    Vertical TD: 8524 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/16/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/29/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1943 FSL  1728 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 1943 FSL  1728 FEL
Proposed Depth/Form:8606 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/2/2010
Spud Date:2/23/2010Spud Date Is:ACTUAL
Measured TD:8706 ft.Measured PB depth:8648 ft.
True Vertical TD:8524 ft.True Vertical PB depth:8466 ft.
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 1938 FSL  1718 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 1934 FSL  1724 FEL
Log Types:CBL; RPM, MUD
Log Types:CBL/RESERVOIR MONITOR TOOL ELITE-(NOT PRESENT), MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 61 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 61 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 871 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 871 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8689 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 967, Top: 2700 ft., Bottom: 8689 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2700 ft.
WASATCH G2700 ft.NN
MESAVERDE4963 ft.
CAMEO7775 ft.
ROLLINS8499 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/30/2010                 Interval Top: 6284 ft.    Interval Bottom: 8406 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/24/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/23/2010
Treatment Summary:4663 GALS 7 1/2% HCL; 1188932# 30/50 SAND; 33664 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:8122 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CASING_PRESS 2038
MCF_GAS 1015
TUBING_PRESS 1835
Perforation Data:
Interval Top:6284 ft.# Of Holes:168
Interval Bottom:8406 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)14332
GOR434303
GOR DeterminationMCFE
Average BOE per Day6.865
Average MCFE per Day39.797

 Federal Financial Assurance  i Y

 Tribal Well  i No