Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18002
Well Classification: GW Status: SI - 1/1/2026
Well Name/No:596-19A #18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:300774LocationID:335992
County:GARFIELD #045Location:NESW 19 5S96W 6
Field:TRAIL RIDGE - #83825Elevation:8431 ft.
Basin:PICEANCE BASIN  
Planned Location:1583FSL  1286 FWLLat/Long: 39.597720 / -108.212920Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.597720 / -108.212920Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2026             Measured TD: 10285 ft.    Vertical TD: 10024 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20087551 Expiration Date:1/13/2010
Proposed Top PZ Location:Sec: Twp: Footage: 2440 FNL  1984 FEL
Bottom Hole Location:Sec:19 Twp: 5S 96W Footage: 2440 FNL  1984 FEL
Proposed Depth/Form:10450 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/6/2009
Spud Date:6/22/2009Spud Date Is:ACTUAL
Measured TD:10285 ft.Measured PB depth:10179 ft.
True Vertical TD:10024 ft.True Vertical PB depth:9917 ft.
Top PZ Location:Sec:19 Twp: 5S 96WFootage: 2466 FNL  2073 FEL
Bottom Hole Location:Sec:19 Twp: 5S 96WFootage: 2468 FNL  2066 FEL
Log Types:MUD, RAD-ANALYSIS BOND; COMPACT DUAL-NEUTRON/GAMMARAY; MONOPOLE-DIPOLE ARRAY
Log Types:Bond, Sonic, Neutron, Mud
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 139 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: 139 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2265 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1286, Top: , Bottom: 2265 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10244 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 904, Top: 3823 ft., Bottom: 10244 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4949 ft.
FORT UNION5312 ft.
MESAVERDE6915 ft.
CAMEO9537 ft.
ROLLINS10048 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 1/1/2026                  Interval Top: 8448 ft.    Interval Bottom: 9856 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/21/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/4/2010
Treatment Summary:7 Stages: Frac w/ 635,496# 30/50 Ottawa Sd & 19,683 bbls Slickwater
Tubing Size:2.375 in.Tubing Setting Depth:9808 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2010Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 208
BTU_GAS 1043
CALC_MCF_GAS 1330
CASING_PRESS 1410
MCF_GAS 1330
TUBING_PRESS 900
Perforation Data:
Interval Top:8448 ft.# Of Holes:164
Interval Bottom:9856 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)58
Total Gas Produced (MCF)21967
GOR378741
GOR DeterminationMCFE
Average BOE per Day10.485
Average MCFE per Day60.788

 Federal Financial Assurance  i 

 Tribal Well  i No