|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/16/2011 Measured TD: 7220 ft. Vertical TD: 6883 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/16/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/22/2010 | | Proposed Top PZ Location: | Sec:32 Twp: 6S 96W | Footage: 1302 FSL 98 FEL | | Bottom Hole Location: | Sec:32 Twp: 6S 96W | Footage: 1286 FSL 115 FEL | | Proposed Depth/Form: | 7178 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: SE/4 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1300 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 454, Top: 0 ft., Bottom: 1300 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7178 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 545, Top: , Bottom: 7178 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/29/2010 | | Spud Date: | 10/20/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7220 ft. | Measured PB depth: | 7172 ft. | | True Vertical TD: | 6883 ft. | True Vertical PB depth: | 6835 ft. | | Top PZ Location: | Sec:32 Twp: 6S 96W | Footage: 1302 FSL 98 FEL | | Bottom Hole Location: | Sec:32 Twp: 6S 96W | Footage: 1286 FSL 115 FEL | | Log Types: | CBL AND RESERVOIR PERFORMANCE MONITOR (RPM)
Mud | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 61 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 23, Top: 0 ft., Bottom: 61 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 836 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7202 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 975, Top: 5458 ft., Bottom: 7202 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 5230 ft., Depth: 5170 ft., Bottom: 5360 ft., Sacks: 200, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NOT COMPLETED | 2535 ft. | | | | | NOT COMPLETED | 2535 ft. | | | | | NOT COMPLETED | 2535 ft. | | | | | NOT COMPLETED | 2535 ft. | | | | | MESAVERDE | 4079 ft. | | | | | CAMEO | 6603 ft. | | | | | ROLLINS | 7081 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 2/28/2011 Interval Top: 5514 ft. Interval Bottom: 7035 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/5/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/30/2010 | | Treatment Summary: | 2527 GALS OF 7.5% HCL; 550000# OF 40/70 SAND; 18433 BBLS SLICKWATER (SUMMARY). |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6816 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1071 | | CASING_PRESS | 1223 | | MCF_GAS | 996 | | TUBING_PRESS | 826 |
| | Perforation Data: | | Interval Top: | 5514 ft. | # Of Holes: | 139 | | Interval Bottom: | 7035 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 33 |
| Total Gas Produced (MCF) | 16702 |
| GOR | 506121 |
| GOR Determination | MCFE |
| Average BOE per Day | 7.983 |
| Average MCFE per Day | 46.291 |
| Federal Financial Assurance | i | Y |
|
|