|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/16/2016 Measured TD: 9692 ft. Vertical TD: 9472 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/16/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/2/2016 | | Proposed Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 209 FSL 624 FWL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 209 FSL 625 FWL | | Proposed Depth/Form: | 9585 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3033 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1126, Top: 0 ft., Bottom: 3033 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9585 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 535, Top: 5879 ft., Bottom: 9585 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/17/2014 | | Spud Date: | 6/13/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 9692 ft. | Measured PB depth: | 9651 ft. | | True Vertical TD: | 9472 ft. | True Vertical PB depth: | 9431 ft. | | Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 228 FSL 648 FWL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 221 FSL 621 FWL | | Log Types: | RPM/MUD/CBL/Triple Combo on 045-19168 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3054 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 2996, Top: 0 ft., Bottom: 3054 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9682 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1190, Top: 3872 ft., Bottom: 9682 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4279 ft. | | | | | WILLIAMS FORK | 5833 ft. | | | | | MESAVERDE | 5833 ft. | | | | | CAMEO | 8137 ft. | | | | | ROLLINS | 8537 ft. | | | | | COZZETTE | 8718 ft. | | | | | CORCORAN | 8966 ft. | | | |
Formation CRCRN Formation Classification: GW Status: PR - 11/16/2016 Interval Top: 9002 ft. Interval Bottom: 9149 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 8/29/2014 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/18/2014 | Treatment End Date: | 8/18/2014 | | Treatment Summary: | 397 Gals 7 1/2% HCL; 2702 BBLs Slickwater; 93691 #40/70 Sand; 7609 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 2711 | Max pressure during treatment (psi): | 7581 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 9 | Min frac gradient (psi/ft): | 0.51 | | Recycled water used in treatment (bbls): | 2702 | Total flowback volume recovered (bbls): | 934 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 101300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 9002 ft. | # Of Holes: | 24 | | Interval Bottom: | 9149 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 11/16/2016 Interval Top: 8767 ft. Interval Bottom: 8956 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 8/29/2014 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/18/2014 | Treatment End Date: | 8/18/2014 | | Treatment Summary: | 517 Gals 7 1/2% HCL; 2844 BBLs Slickwater; 97861 #40/70 Sand; 8639 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 2856 | Max pressure during treatment (psi): | 7581 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.51 | | Recycled water used in treatment (bbls): | 2844 | Total flowback volume recovered (bbls): | 973 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 106500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 8767 ft. | # Of Holes: | 24 | | Interval Bottom: | 8956 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCC Formation Classification: GW Status: CM - 10/4/2014 Interval Top: 6448 ft. Interval Bottom: 9149 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN | | 1st Production Date: | 8/29/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/11/2014 | Treatment End Date: | 7/8/2015 | | Treatment Summary: | 2858 Gals 7 1/2% HCL; 2395 Gals 10% HCL; 26962 BBLs Slickwater; 1025139 #40/70 Sand; 102261 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 27087 | Max pressure during treatment (psi): | 7581 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 125 | Min frac gradient (psi/ft): | 0.51 | | Recycled water used in treatment (bbls): | 26962 | Total flowback volume recovered (bbls): | 4294 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1127400 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8881 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/4/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1072 | | CALC_MCF_GAS | 107 | | CASING_PRESS | 1405 | | MCF_GAS | 107 | | TUBING_PRESS | 1161 |
| | Perforation Data: | | Interval Top: | 6448 ft. | # Of Holes: | 240 | | Interval Bottom: | 9149 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 11/16/2016 Interval Top: 6448 ft. Interval Bottom: 8479 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/29/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/18/2014 | Treatment End Date: | 7/10/2015 | | Treatment Summary: | 1944 Gals 7 1/2% HCL; 2395 Gals 10% HCL; 21417 BBLs Slickwater; 833587 #40/70 Sand; 86013 #20/40 Sand: (summary)
| | Total fluid used in treatment (bbls): | 21520 | Max pressure during treatment (psi): | 7581 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 103 | Min frac gradient (psi/ft): | 0.51 | | Recycled water used in treatment (bbls): | 21417 | Total flowback volume recovered (bbls): | 2387 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 919600 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 6448 ft. | # Of Holes: | 192 | | Interval Bottom: | 8479 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 104 |
| Total Gas Produced (MCF) | 39081 |
| GOR | 375778 |
| GOR Determination | MCFE |
| Average BOE per Day | 18.767 |
| Average MCFE per Day | 108.867 |
| Federal Financial Assurance | i | |
|
|