|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/10/2014 Measured TD: 9650 ft. Vertical TD: 9431 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/10/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/2/2016 | | Proposed Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 1692 FSL 626 FWL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 1692 FSL 626 FWL | | Proposed Depth/Form: | 9603 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3028 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 1124, Top: 0 ft., Bottom: 3028 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9603 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 535, Top: 5881 ft., Bottom: 9603 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/28/2014 | | Spud Date: | 8/6/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 9650 ft. | Measured PB depth: | 9557 ft. | | True Vertical TD: | 9431 ft. | True Vertical PB depth: | 9338 ft. | | Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 1682 FSL 638 FWL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 1669 FSL 622 FWL | | Log Types: | RPM/CBL/MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3059 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 1820, Top: 0 ft., Bottom: 3059 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9637 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1160, Top: 2910 ft., Bottom: 9637 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4305 ft. | | | | | MESAVERDE | 5867 ft. | | | | | CAMEO | 8162 ft. | | | | | ROLLINS | 8541 ft. | | | | | COZZETTE | 8715 ft. | | | | | CORCORAN | 8978 ft. | | | |
Formation COZZ Formation Classification: GW Status: PR - 4/1/2015 Interval Top: 8991 ft. Interval Bottom: 9194 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 10/14/2014 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/4/2014 | Treatment End Date: | 10/4/2014 | | Treatment Summary: | 249 Gals 7 ½% HCL; 3334 Bbls Slickwater; 119100 # 40/70 Sand; 8900 # 20/40 Sand (Summary) | | Total fluid used in treatment (bbls): | 3339 | Max pressure during treatment (psi): | 5244 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 5 | Min frac gradient (psi/ft): | 0.53 | | Recycled water used in treatment (bbls): | 3334 | Total flowback volume recovered (bbls): | 10025 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 128000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 8991 ft. | # Of Holes: | 24 | | Interval Bottom: | 9194 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 4/1/2015 Interval Top: 8891 ft. Interval Bottom: 9194 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 10/14/2014 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/4/2014 | Treatment End Date: | 10/4/2014 | | Treatment Summary: | 475 Gals 7 ½% HCL; 4017 Bbls Slickwater; 131800 # 40/70 Sand; 11000 # 20/40 Sand (Summary)
| | Total fluid used in treatment (bbls): | 4028 | Max pressure during treatment (psi): | 5244 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 11 | Min frac gradient (psi/ft): | 0.53 | | Recycled water used in treatment (bbls): | 4017 | Total flowback volume recovered (bbls): | 10025 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 142800 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 8891 ft. | # Of Holes: | 24 | | Interval Bottom: | 9194 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 4/1/2015 Interval Top: 7548 ft. Interval Bottom: 8519 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/14/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/5/2014 | Treatment End Date: | 10/7/2014 | | Treatment Summary: | 2239 Gals 7 ½% HCL; 13460 Bbls Slickwater; 471900 # 40/70 Sand; 34400 # 20/40 Sand (Summary)
| | Total fluid used in treatment (bbls): | 13513 | Max pressure during treatment (psi): | 5244 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 5 | | Total acid used in treatment (bbls): | 53 | Min frac gradient (psi/ft): | 0.53 | | Recycled water used in treatment (bbls): | 13460 | Total flowback volume recovered (bbls): | 10025 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 506300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 7548 ft. | # Of Holes: | 118 | | Interval Bottom: | 8519 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 11/30/2014 Interval Top: 7548 ft. Interval Bottom: 9194 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 10/14/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/4/2014 | Treatment End Date: | 10/7/2014 | | Treatment Summary: | 2963 Gals 7 ½% HCL; 20811 Bbls Slickwater; 722800# 40/70 Sand; 54300 # 20/40 Sand (Summary) | | Total fluid used in treatment (bbls): | 20882 | Max pressure during treatment (psi): | 5244 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 70 | Min frac gradient (psi/ft): | 0.53 | | Recycled water used in treatment (bbls): | 20811 | Total flowback volume recovered (bbls): | 10025 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 777100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9025 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/30/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1078 | | CALC_MCF_GAS | 758 | | CASING_PRESS | 1573 | | MCF_GAS | 758 | | TUBING_PRESS | 1204 |
| | Perforation Data: | | Interval Top: | 7548 ft. | # Of Holes: | 166 | | Interval Bottom: | 9194 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 120 |
| Total Gas Produced (MCF) | 45399 |
| GOR | 378325 |
| GOR Determination | MCFE |
| Average BOE per Day | 21.790 |
| Average MCFE per Day | 126.404 |
| Federal Financial Assurance | i | |
|
|