|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/14/2014 Measured TD: 9585 ft. Vertical TD: 9376 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/14/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/2/2016 | | Proposed Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 511 FSL 568 FWL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 511 FSL 569 FWL | | Proposed Depth/Form: | 9565 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3012 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1118, Top: 0 ft., Bottom: 3012 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9565 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 538, Top: 5841 ft., Bottom: 9565 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/23/2014 | | Spud Date: | 6/7/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 9585 ft. | Measured PB depth: | 9525 ft. | | True Vertical TD: | 9376 ft. | True Vertical PB depth: | 9316 ft. | | Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 512 FSL 566 FWL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 506 FSL 556 FWL | | Log Types: | RPM/CBL/MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3039 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1725, Top: 0 ft., Bottom: 3039 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9573 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1190, Top: 3330 ft., Bottom: 9573 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4111 ft. | | | | | MESAVERDE | 5829 ft. | | | | | CAMEO | 8129 ft. | | | | | ROLLINS | 8537 ft. | | | | | COZZETTE | 8712 ft. | | | | | CORCORAN | 8953 ft. | | | |
Formation CRCRN Formation Classification: GW Status: PR - 1/2/2015 Interval Top: 8990 ft. Interval Bottom: 9138 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 8/27/2014 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/18/2014 | Treatment End Date: | 8/18/2014 | | Treatment Summary: | 457 Gals 7 ½% HCL; 3037 Bbls Slickwater; 109383 # 40/70 Sand; 10117 # 20/40 Sand (Summary)
| | Total fluid used in treatment (bbls): | 3048 | Max pressure during treatment (psi): | 3901 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 10 | Min frac gradient (psi/ft): | 0.50 | | Recycled water used in treatment (bbls): | 3037 | Total flowback volume recovered (bbls): | 7603 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 119500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 8990 ft. | # Of Holes: | 24 | | Interval Bottom: | 9138 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 1/2/2015 Interval Top: 8762 ft. Interval Bottom: 8942 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 8/27/2014 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/18/2014 | Treatment End Date: | 8/18/2014 | | Treatment Summary: | 529 Gals 7 ½% HCL; 3747 Bbls Slickwater; 137591 # 40/70 Sand; 10409 # 20/40 Sand (Summary)
| | Total fluid used in treatment (bbls): | 3760 | Max pressure during treatment (psi): | 3901 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.50 | | Recycled water used in treatment (bbls): | 3747 | Total flowback volume recovered (bbls): | 7603 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 148000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 8762 ft. | # Of Holes: | 24 | | Interval Bottom: | 8942 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 1/2/2015 Interval Top: 7601 ft. Interval Bottom: 8489 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/27/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/19/2014 | Treatment End Date: | 8/19/2014 | | Treatment Summary: | 1399 Gals 7 ½% HCL; 10310 Bbls Slickwater; 370934 # 40/70 Sand; 32566 # 20/40 Sand (Summary)
| | Total fluid used in treatment (bbls): | 10343 | Max pressure during treatment (psi): | 3901 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 4 | | Total acid used in treatment (bbls): | 33 | Min frac gradient (psi/ft): | 0.50 | | Recycled water used in treatment (bbls): | 10310 | Total flowback volume recovered (bbls): | 7603 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 403500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 7601 ft. | # Of Holes: | 96 | | Interval Bottom: | 8489 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 9/30/2014 Interval Top: 7601 ft. Interval Bottom: 9138 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 8/27/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/18/2014 | Treatment End Date: | 8/19/2014 | | Treatment Summary: | 2385 Gals 7 ½% HCL; 718020 Bbls Slickwater; 617908 # 40/70 Sand; 53092 # 20/40 Sand (Summary)
| | Total fluid used in treatment (bbls): | 17150 | Max pressure during treatment (psi): | 3901 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 56 | Min frac gradient (psi/ft): | 0.50 | | Recycled water used in treatment (bbls): | 17094 | Total flowback volume recovered (bbls): | 7603 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 671000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8979 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/30/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1066 | | CALC_MCF_GAS | 989 | | CASING_PRESS | 1409 | | MCF_GAS | 989 | | TUBING_PRESS | 1003 |
| | Perforation Data: | | Interval Top: | 7601 ft. | # Of Holes: | 144 | | Interval Bottom: | 9138 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 104 |
| Total Gas Produced (MCF) | 39707 |
| GOR | 381798 |
| GOR Determination | MCFE |
| Average BOE per Day | 19.065 |
| Average MCFE per Day | 110.594 |
| Federal Financial Assurance | i | |
|
|