Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17466
Well Classification: GW Status: PR - 6/6/2010
Well Name/No:WILLIAMS #RWF 44-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CA COC53847
Facility Status:PRStatus Date6/6/2010
FacilityID:298903LocationID:334690
County:GARFIELD #045Location:NESE 33 6S94W 6
Field:RULISON - #75400Elevation:5499 ft.
Basin:PICEANCE BASIN  
Planned Location:2011FSL  913 FELLat/Long: 39.480009 / -107.886741Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.480013 / -107.886739Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/6/2010             Measured TD: 7818 ft.    Vertical TD: 7531 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/6/2010
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/25/2011
Proposed Top PZ Location:Sec:33 Twp: 6S 94W Footage: 563 FSL  334 FEL
Bottom Hole Location:Sec:33 Twp: 6S 94W Footage: 563 FSL  334 FEL
Proposed Depth/Form:7987 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1140 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1140 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7987 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 750, Top: 200 ft., Bottom: 7987 ft.

Wellbore Completed
Completion Date:4/21/2010
Spud Date:4/13/2010Spud Date Is:ACTUAL
Measured TD:7818 ft.Measured PB depth:7775 ft.
True Vertical TD:7531 ft.True Vertical PB depth:7488 ft.
Top PZ Location:Sec:33 Twp: 6S 94WFootage: 571 FSL  217 FEL
Bottom Hole Location:Sec:33 Twp: 6S 94WFootage: 559 FSL  221 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE; mud
Log Types:CBL, RPM
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1183 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1183 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7803 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1330, Top: 2780 ft., Bottom: 7803 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1620 ft.
WASATCH G1620 ft.
MESAVERDE4040 ft.
CAMEO6670 ft.
ROLLINS7550 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/6/2010                  Interval Top: 5918 ft.    Interval Bottom: 7733 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/8/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7422 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1040
CASING_PRESS 1722
MCF_GAS 626
TUBING_PRESS 1586
Perforation Data:
Interval Top:5918 ft.# Of Holes:127
Interval Bottom:7733 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)35
Total Gas Produced (MCF)27530
GOR786571
GOR DeterminationMCFE
Average BOE per Day13.096
Average MCFE per Day75.946

 Federal Financial Assurance  i 

 Tribal Well  i No