Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17092
Well Classification: GW Status: PR - 9/5/2008
Well Name/No:WILLIAMS #GM 414-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC23794
Facility Status:PRStatus Date9/5/2008
FacilityID:298162LocationID:335107
County:GARFIELD #045Location:NENW 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5686 ft.
Basin:PICEANCE BASIN  
Planned Location:834FNL  2628 FWLLat/Long: 39.485458 / -108.132436Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485462 / -108.132435Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2008             Measured TD: 7162 ft.    Vertical TD: 6683 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20084402 Expiration Date:9/4/2009
Proposed Top PZ Location:Sec: Twp: Footage: 174 FSL  934 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96W Footage: 174 FSL  934 FWL
Proposed Depth/Form:7150 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/2/2009
Spud Date:4/24/2009Spud Date Is:ACTUAL
Measured TD:7162 ft.Measured PB depth:7107 ft.
True Vertical TD:6683 ft.True Vertical PB depth:6628 ft.
Top PZ Location:Sec:29 Twp: 6S 96WFootage: 161 FSL  931 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96WFootage: 161 FSL  931 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1372 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 330, Top: , Bottom: 1372 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7139 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 3300 ft., Bottom: 7139 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2198 ft.NN
MESAVERDE4073 ft.NN
CAMEO6496 ft.NN
ROLLINS7019 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/30/2009                 Interval Top: 5315 ft.    Interval Bottom: 6940 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/12/2009Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2009
Treatment Summary:3000 GALS 7 1/2% HCL; 831100# 30/50 SAND; 22485 BBLS SLICKWATER.
Tubing Size:2.375 in.Tubing Setting Depth:6685 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1075
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 858
MCF_GAS 983
TUBING_PRESS 812
Perforation Data:
Interval Top:5315 ft.# Of Holes:112
Interval Bottom:6940 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)30
Total Gas Produced (MCF)18108
GOR603600
GOR DeterminationMCFE
Average BOE per Day8.638
Average MCFE per Day50.098

 Federal Financial Assurance  i Y

 Tribal Well  i No