Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16997
Well Classification: GW Status: PR - 2/26/2009
Well Name/No:DIAMOND ELK #PA 434-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/26/2009
FacilityID:297895LocationID:335029
County:GARFIELD #045Location:SWSE 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5447 ft.
Basin:PICEANCE BASIN  
Planned Location:969FSL  2484 FELLat/Long: 39.476460 / -107.946667Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476457 / -107.946666Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/26/2009             Measured TD: 7900 ft.    Vertical TD: 7790 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/26/2009
Wellbore PermitDIRECTIONAL
Permit #:20091191 Expiration Date:7/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 290 FSL  1645 FEL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 290 FSL  1645 FEL
Proposed Depth/Form:7901 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/4/2009
Spud Date:6/28/2009Spud Date Is:ACTUAL
Measured TD:7900 ft.Measured PB depth:7850 ft.
True Vertical TD:7790 ft.True Vertical PB depth:7740 ft.
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 336 FSL  1638 FEL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 336 FSL  1638 FEL
Log Types:CBL; IND/DEN/NEU, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 68 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 68 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 9.625 in., Top: 0 ft., Depth: 829 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 829 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7883 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 913, Top: 2380 ft., Bottom: 7883 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1932 ft.NN
MESAVERDE4333 ft.NN
CAMEO6772 ft.NN
ROLLINS7768 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2009                Interval Top: 5723 ft.    Interval Bottom: 7633 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/30/2009Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2009
Treatment Summary:4499 GALS 7.5% HCL; 885944# 30/50 SAND; 23457 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7316 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1033
CASING_PRESS 1540
MCF_GAS 1082
TUBING_PRESS 1415
Perforation Data:
Interval Top:5723 ft.# Of Holes:163
Interval Bottom:7633 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)14149
GOR832294
GOR DeterminationMCFE
Average BOE per Day6.737
Average MCFE per Day39.075

 Federal Financial Assurance  i 

 Tribal Well  i No