Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16343
Well Classification: GW Status: PR - 7/17/2008
Well Name/No:PUCKETT #GM 421-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/17/2008
FacilityID:297231LocationID:334811
County:GARFIELD #045Location:SWNW 6 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6397 ft.
Basin:PICEANCE BASIN  
Planned Location:1320FNL  1252 FWLLat/Long: 39.469550 / -108.154779Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.469538 / -108.154820Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/16/2008             Measured TD: 7047 ft.    Vertical TD: 6955 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/16/2008
Wellbore PermitDIRECTIONAL
Permit #:20083397 Expiration Date:7/16/2009
Proposed Top PZ Location:Sec: Twp: Footage: 857 FNL  2083 FWL
Bottom Hole Location:Sec:6 Twp: 7S 96W Footage: 857 FNL  2083 FWL
Proposed Depth/Form:7168 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: 160, Drill Unit: NW/4

Wellbore Completed
Completion Date:1/11/2009
Spud Date:1/3/2009Spud Date Is:ACTUAL
Measured TD:7047 ft.Measured PB depth:6990 ft.
True Vertical TD:6955 ft.True Vertical PB depth:6898 ft.
Top PZ Location:Sec:6 Twp: 7S 96WFootage: 863 FNL  2075 FWL
Bottom Hole Location:Sec:6 Twp: 7S 96WFootage: 863 FNL  2075 FWL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 760 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 0 ft., Bottom: 760 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 7026 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 762, Top: 2858 ft., Bottom: 7026 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2511 ft.NN
MESAVERDE4056 ft.NN
CAMEO6425 ft.NN
ROLLINS6943 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/17/2009                 Interval Top: 5509 ft.    Interval Bottom: 6797 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/16/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2009
Treatment Summary:2750 GALS 7.5% HCL; 626,000# 30/50 SAND; 19,097 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6566 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/17/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1075
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1010
GRAVITY_OIL 55
MCF_GAS 1098
TUBING_PRESS 806
Perforation Data:
Interval Top:5509 ft.# Of Holes:90
Interval Bottom:6797 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)34
Total Gas Produced (MCF)19382
GOR570058
GOR DeterminationMCFE
Average BOE per Day9.251
Average MCFE per Day53.627

 Federal Financial Assurance  i 

 Tribal Well  i No