Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16329
Well Classification: GW Status: PR - 6/30/2010
Well Name/No:FEDERAL #RWF 444-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C46030
Facility Status:PRStatus Date6/30/2010
FacilityID:297154LocationID:334848
County:GARFIELD #045Location:SWSE 4 7S94W 6
Field:RULISON - #75400Elevation:6272 ft.
Basin:PICEANCE BASIN  
Planned Location:656FSL  1999 FELLat/Long: 39.461791 / -107.890157Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461800 / -107.890158Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2010             Measured TD: 8665 ft.    Vertical TD: 8361 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2010
Wellbore PermitDIRECTIONAL
Permit #:20091140 Expiration Date:5/7/2010
Proposed Top PZ Location:Sec: Twp: Footage: 448 FSL  337 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 448 FSL  337 FEL
Proposed Depth/Form:8664 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:8/29/2009
Spud Date:8/23/2009Spud Date Is:ACTUAL
Measured TD:8665 ft.Measured PB depth:8619 ft.
True Vertical TD:8361 ft.True Vertical PB depth:8315 ft.
Top PZ Location:Sec:4 Twp: 7S 64WFootage: 482 FSL  326 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 480 FSL  316 FEL
Log Types:CBL, RPM
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 45 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1119 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1119 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8652 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 3800 ft., Bottom: 8652 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
J SAND2534 ft.
WASATCH G2534 ft.NN
MESAVERDE5109 ft.
CAMEO7626 ft.
ROLLINS8573 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2010                 Interval Top: 6700 ft.    Interval Bottom: 8345 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/7/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/5/2010
Treatment Summary:4997 GALS 7 1/2% HCL 785600 # 20/40 SAND: 21081 BBLS SLICKWATER(SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8040 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1058
CALC_MCF_GAS 1088
CASING_PRESS 1593
MCF_GAS 1088
TUBING_PRESS 1455
Perforation Data:
Interval Top:6700 ft.# Of Holes:152
Interval Bottom:8345 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)43
Total Gas Produced (MCF)20713
GOR481697
GOR DeterminationMCFE
Average BOE per Day9.902
Average MCFE per Day57.435

 Federal Financial Assurance  i Y

 Tribal Well  i No