Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16268
Well Classification: GW Status: PR - 12/1/2011
Well Name/No:CHEVRON #TR 313-25-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2011
FacilityID:297039LocationID:335916
County:GARFIELD #045Location:SWNW 25 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8430 ft.
Basin:PICEANCE BASIN  
Planned Location:1712FNL  1101 FWLLat/Long: 39.587204 / -108.232318Lat/Long Source: Field Measured
As Drilled Location:1712 FNL  1102 FWLLat/Long: 39.587205 / -108.232316Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2012             Measured TD: 9645 ft.    Vertical TD: 9491 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2012
Wellbore PermitDIRECTIONAL
Permit #:20082993 Expiration Date:7/9/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2365 FSL  594 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97W Footage: 2365 FSL  594 FWL
Proposed Depth/Form:9745 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/13/2008
Spud Date:9/30/2008Spud Date Is:ACTUAL
Measured TD:9645 ft.Measured PB depth:9573 ft.
True Vertical TD:9491 ft.True Vertical PB depth:9419 ft.
Top PZ Location:Sec:25 Twp: 5S 97WFootage: 2360 FSL  620 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97WFootage: 2337 FSL  520 FWL
Log Types:CBL, RMTE, MUD
Log Types:CBL, HRI, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2860 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1775, Top: 0 ft., Bottom: 2860 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9624 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 795, Top: 3400 ft., Bottom: 9624 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6423 ft.
CAMEO8999 ft.
ROLLINS9433 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2012                  Interval Top: 7250 ft.    Interval Bottom: 9403 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/6/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/25/2010
Treatment Summary:10498 GALS 10% HCL ACID; 1613122# 20/40 SAND; 46990 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.38 in.Tubing Setting Depth:9299 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/6/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1057
CASING_PRESS 1367
MCF_GAS 1257
TUBING_PRESS 1096
Perforation Data:
Interval Top:7250 ft.# Of Holes:235
Interval Bottom:9403 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)40
Total Gas Produced (MCF)21686
GOR542150
GOR DeterminationMCFE
Average BOE per Day10.361
Average MCFE per Day60.091

 Federal Financial Assurance  i 

 Tribal Well  i No