Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16268
Well Classification: GW Status: PR - 12/1/2011
Well Name/No:CHEVRON #TR 313-25-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2011
FacilityID:297039LocationID:335916
County:GARFIELD #045Location:SWNW 25 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8430 ft.
Basin:PICEANCE BASIN  
Planned Location:1712FNL  1101 FWLLat/Long: 39.587204 / -108.232318Lat/Long Source: Field Measured
As Drilled Location:1712 FNL  1102 FWLLat/Long: 39.587205 / -108.232316Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2012             Measured TD: 9645 ft.    Vertical TD: 9491 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2012
Wellbore PermitDIRECTIONAL
Permit #:20082993 Expiration Date:7/9/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2365 FSL  594 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97W Footage: 2365 FSL  594 FWL
Proposed Depth/Form:9745 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/13/2008
Spud Date:9/30/2008Spud Date Is:ACTUAL
Measured TD:9645 ft.Measured PB depth:9573 ft.
True Vertical TD:9491 ft.True Vertical PB depth:9419 ft.
Top PZ Location:Sec:25 Twp: 5S 97WFootage: 2360 FSL  620 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97WFootage: 2337 FSL  520 FWL
Log Types:CBL, RMTE, MUD
Log Types:CBL, HRI, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2860 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1775, Top: 0 ft., Bottom: 2860 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9624 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 795, Top: 3400 ft., Bottom: 9624 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6423 ft.
CAMEO8999 ft.
ROLLINS9433 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2012                  Interval Top: 7250 ft.    Interval Bottom: 9403 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/6/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/25/2010
Treatment Summary:10498 GALS 10% HCL ACID; 1613122# 20/40 SAND; 46990 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.38 in.Tubing Setting Depth:9299 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/6/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1057
CASING_PRESS 1367
MCF_GAS 1257
TUBING_PRESS 1096
Perforation Data:
Interval Top:7250 ft.# Of Holes:235
Interval Bottom:9403 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)36
Total Gas Produced (MCF)22130
GOR614722
GOR DeterminationMCFE
Average BOE per Day10.559
Average MCFE per Day61.232

 Federal Financial Assurance  i 

 Tribal Well  i No