Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15726
Well Classification: GW Status: PR - 4/1/2024
Well Name/No:LEVERICH #31-05B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2024
FacilityID:295308LocationID:334714
County:GARFIELD #045Location:SENW 31 6S93W 6
Field:RULISON - #75400Elevation:6664 ft.
Basin:PICEANCE BASIN  
Planned Location:2426FNL  1538 FWLLat/Long: 39.482936 / -107.821297Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.482980 / -107.821300Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2024             Measured TD: 9240 ft.    Vertical TD: 9138 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20080777 Expiration Date:4/2/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1809 FNL  669 FWL
Bottom Hole Location:Sec:31 Twp: 6S 93W Footage: 1809 FNL  669 FWL
Proposed Depth/Form:9234 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: 139-47 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:8/6/2008
Spud Date:5/31/2008Spud Date Is:ACTUAL
Measured TD:9240 ft.Measured PB depth:9196 ft.
True Vertical TD:9138 ft.True Vertical PB depth:9094 ft.
Top PZ Location:Sec:31 Twp: 6S 93WFootage: 1799 FNL  662 FWL
Bottom Hole Location:Sec:31 Twp: 6S 93WFootage: 1799 FNL  662 FWL
Log Types:DSN/SD, HRI/GR/CAL/TEMP, CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1502 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1502 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9240 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 5880 ft., Bottom: 9240 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5335 ft.NN
ROLLINS9082 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2024                  Interval Top: 6995 ft.    Interval Bottom: 9051 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/29/2008Choke Size:18.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/25/2008
Treatment Summary:1284945 GALS. SLICKWATER. 742900 20/40 WHITE SAND. 4500 GALS 15% HCL ACID.
Tubing Size:2.375 in.Tubing Setting Depth:8541 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/13/2008Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 0
BTU_GAS 1100
CALC_GOR 0
CASING_PRESS 1150
MCF_GAS 1317
Perforation Data:
Interval Top:6995 ft.# Of Holes:180
Interval Bottom:9051 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)90
Total Gas Produced (MCF)20197
GOR224411
GOR DeterminationMCFE
Average BOE per Day9.785
Average MCFE per Day56.762

 Federal Financial Assurance  i 

 Tribal Well  i No