Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15689
Well Classification: DSPW Status: SI - 12/1/2017
Well Name/No:PARACHUTE RANCH #26-34B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2017
FacilityID:295178LocationID:334405
County:GARFIELD #045Location:SWSE 26 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5278 ft.
Basin:PICEANCE BASIN  
Planned Location:904FSL  2348 FELLat/Long: 39.403807 / -108.075850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.403786 / -108.075852Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2017             Measured TD: 6082 ft.    Vertical TD: 6055 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2017
Wellbore PermitDIRECTIONAL
Permit #:20088486 Expiration Date:2/24/2010
Proposed Top PZ Location:Sec:26 Twp: 7S 96W Footage: 868 FSL  2004 FEL
Bottom Hole Location:Sec:26 Twp: 7S 96W Footage: 868 FSL  2004 FEL
Proposed Depth/Form:6432 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 510-36 , Unit Acreage: 40, Drill Unit: SWSE
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-36 , Unit Acreage: 40, Drill Unit: SWSE

Wellbore Completed
Completion Date:9/3/2009
Spud Date:8/29/2009Spud Date Is:ACTUAL
Measured TD:6082 ft.Measured PB depth:6082 ft.
True Vertical TD:6055 ft.True Vertical PB depth:
Top PZ Location:Sec:26 Twp: 7S 96WFootage: 868 FSL  2004 FEL
Bottom Hole Location:Sec:26 Twp: 7S 96WFootage: 868 FSL  2004 FEL
Log Types:CBL/CNL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 120 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1525 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 416, Top: 0 ft., Bottom: 1525 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6072 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 696, Top: 1900 ft., Bottom: 6072 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK2529 ft.NN
ROLLINS3615 ft.NN
CAMEO4886 ft.NN
COZZETTE5570 ft.NN
CORCORAN5799 ft.NN
MANCOS5900 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 12/1/2017                 Interval Top: 5856 ft.    Interval Bottom: 5892 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:1/26/2010
Treatment Summary:FRAC 750 GAL OF 7.5% HCL; 114,908 GAL OF 2% KCL; 662 SKS OF OTTAWA PROPPANT; 160 SKS OF PRIME PLUS
Tubing Size:2.375 in.Tubing Setting Depth:5535 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:5856 ft.# Of Holes:30
Interval Bottom:5892 ft.Hole Size:0.34 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 11/2/2010                 Interval Top: 5584 ft.    Interval Bottom: 5632 ft.

 Completed Information for Formation COZZETTE
1st Production Date:N/AChoke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:1/26/2010
Treatment Summary:FRAC 750 GAL OF 7.5% HCL; 150,738 GAL OF 2% KCL; 954 SKS OF OTTAWA PROPPANT; 240 SKS OF PRIME PLUS
Tubing Size:2.375 in.Tubing Setting Depth:5535 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_GOR 0
Perforation Data:
Interval Top:5584 ft.# Of Holes:30
Interval Bottom:5632 ft.Hole Size:0.34 in.

Formation CZ-CR                   Formation Classification:  GW                   Status:  CM - 6/27/2011                 Interval Top: 5584 ft.    Interval Bottom: 5892 ft.

 Completed Information for Formation COZZETTE-CORCORAN
1st Production Date:N/AChoke Size: 
Formation Name:COZZETTE-CORCORANCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:1/26/2010
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:5535 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CZ-CR.
Perforation Data:
Interval Top:5584 ft.# Of Holes:60
Interval Bottom:5892 ft.Hole Size:0.34 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/01/2017
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No