Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15469
Well Classification: GW Status: PR - 6/1/2023
Well Name/No:BATTLEMENT MESA #36-13B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2023
FacilityID:250LocationID:334180
County:GARFIELD #045Location:NWSW 36 7S95W 6
Field:PARACHUTE - #67350Elevation:8901 ft.
Basin:PICEANCE BASIN  
Planned Location:2036FSL  758 FWLLat/Long: 39.392110 / -107.952831Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.392146 / -107.952819Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2023             Measured TD: 10140 ft.    Vertical TD: 10123 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2023
Wellbore PermitDIRECTIONAL
Permit #:20074480 Expiration Date:1/31/2009
Proposed Top PZ Location:Sec:36 Twp: 7S 95W Footage: 2290 FSL  653 FWL
Bottom Hole Location:Sec:36 Twp: 7S 95W Footage: 2290 FSL  653 FWL
Proposed Depth/Form:10489 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-53 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:8/20/2008
Spud Date:8/3/2008Spud Date Is:ACTUAL
Measured TD:10140 ft.Measured PB depth:10079 ft.
True Vertical TD:10123 ft.True Vertical PB depth:10062 ft.
Top PZ Location:Sec:36 Twp: 7S 95WFootage: 2290 FSL  653 FWL
Bottom Hole Location:Sec:36 Twp: 7S 95WFootage: 2290 FSL  653 FWL
Log Types:CBL, RMTE
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 133 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 133 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3265 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1065, Top: 0 ft., Bottom: 3265 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10125 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 772, Top: 5020 ft., Bottom: 10125 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6861 ft.NN
CAMEO9210 ft.NN
ROLLINS9751 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/1/2023                  Interval Top: 7996 ft.    Interval Bottom: 9684 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/13/2008Choke Size:0.344 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/27/2008
Treatment Summary:FRAC - 5,250 GAL 7.5% HCL; 11,392 BBL 2% KCL; 4,919 SKS 30/50 SAND; 756 TONS CO2.
Tubing Size:2.375 in.Tubing Setting Depth:9498 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/13/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 298
BTU_GAS 1069
CALC_BBLS_H2O 298
CALC_MCF_GAS 1265
CASING_PRESS 1430
MCF_GAS 1265
TUBING_PRESS 940
Perforation Data:
Interval Top:7996 ft.# Of Holes:192
Interval Bottom:9684 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3
Total Gas Produced (MCF)21409
GOR7136333
GOR DeterminationMCFE
Average BOE per Day10.125
Average MCFE per Day58.727

 Federal Financial Assurance  i Y

 Tribal Well  i No