Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15418
Well Classification: GW Status: SI - 11/1/2025
Well Name/No:M. DUTTON #7-14C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:294458LocationID:334127
County:GARFIELD #045Location:SWSW 7 8S95W 6
Field:PARACHUTE - #67350Elevation:6097 ft.
Basin:PICEANCE BASIN  
Planned Location:900FSL  1236 FWLLat/Long: 39.373090 / -108.044030Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.373094 / -108.044036Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2025             Measured TD: 6840 ft.    Vertical TD: 6781 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20076596 Expiration Date:1/21/2009
Proposed Top PZ Location:Sec: Twp: Footage: 460 FSL  796 FWL
Bottom Hole Location:Sec:7 Twp: 8S 95W Footage: 460 FSL  796 FWL
Proposed Depth/Form:7300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-51 , Unit Acreage: 48, Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-45 , Unit Acreage: 48, Drill Unit:

Wellbore Completed
Completion Date:4/30/2008
Spud Date:4/18/2008Spud Date Is:ACTUAL
Measured TD:6840 ft.Measured PB depth:6772 ft.
True Vertical TD:6781 ft.True Vertical PB depth:6713 ft.
Top PZ Location:Sec:7 Twp: 8S 95WFootage: 482 FSL  808 FWL
Bottom Hole Location:Sec:7 Twp: 8S 95WFootage: 482 FSL  808 FWL
Log Types:CBL & RMT
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 84 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 84 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1579 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1579 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6822 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 2936 ft., Bottom: 6822 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3203 ft.NN
CAMEO5695 ft.NN
ROLLINS6035 ft.NN
COZZETTE6335 ft.NN
CORCORAN6568 ft.NN
MANCOS6683 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 11/1/2025                 Interval Top: 6595 ft.    Interval Bottom: 6632 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/7/2008Choke Size:0.313 in.
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/17/2008
Treatment Summary:FRAC- 370 GAL 7.5% OF HCL; 635 BBLS OF 2% KCL; 310 SKS OF 30/50 SAND; 40 TONS OF CO2.
Tubing Size:2.375 in.Tubing Setting Depth:6430 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BTU_GAS 1099
CALC_BBLS_H2O 22
CALC_MCF_GAS 79
CASING_PRESS 1400
MCF_GAS 79
TUBING_PRESS 1400
Perforation Data:
Interval Top:6595 ft.# Of Holes:11
Interval Bottom:6632 ft.Hole Size:0.34 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 6490 ft.    Interval Bottom: 6550 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/7/2008Choke Size:0.313 in.
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/17/2008
Treatment Summary:FRAC- 375 GAL OF 7.5% HCL; 641 BBLS OF 2% KCL; 312 SKS OF 30/50 SAND; 47 TONS OF CO2.
Tubing Size:2.375 in.Tubing Setting Depth:6430 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BTU_GAS 1099
CALC_BBLS_H2O 18
CALC_MCF_GAS 63
CASING_PRESS 1400
MCF_GAS 63
TUBING_PRESS 1400
Perforation Data:
Interval Top:6490 ft.# Of Holes:13
Interval Bottom:6550 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 4600 ft.    Interval Bottom: 5962 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/7/2008Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/19/2008
Treatment Summary:FRAC- 3750 GALS OF 7.5% HCL; 7256 BBLS OF 2% KCL; 2905 SKS OF 30/50 SAND; 407 TONS OF CO2.
Tubing Size:2.375 in.Tubing Setting Depth:6430 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 181
BTU_GAS 1099
CALC_BBLS_H2O 181
CALC_MCF_GAS 645
CASING_PRESS 1400
MCF_GAS 645
TUBING_PRESS 1400
Perforation Data:
Interval Top:4600 ft.# Of Holes:120
Interval Bottom:5962 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.019

 Federal Financial Assurance  i 

 Tribal Well  i No