Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15340
Well Classification: GW Status: PR - 1/8/2008
Well Name/No:FEDERAL #GM 31-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27874
Facility Status:PRStatus Date1/8/2008
FacilityID:294234LocationID:334814
County:GARFIELD #045Location:NENE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5208 ft.
Basin:PICEANCE BASIN  
Planned Location:488FNL  452 FELLat/Long: 39.443479 / -108.069725Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.443477 / -108.069731Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/9/2007             Measured TD: 6335 ft.    Vertical TD: 5935 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/9/2007
Wellbore PermitDIRECTIONAL
Permit #:20076476 Expiration Date:1/6/2009
Proposed Top PZ Location:Sec: Twp: Footage: 178 FNL  2103 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96W Footage: 178 FNL  2103 FEL
Proposed Depth/Form:6327 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:8/22/2008
Spud Date:8/14/2008Spud Date Is:ACTUAL
Measured TD:6335 ft.Measured PB depth:6254 ft.
True Vertical TD:5935 ft.True Vertical PB depth:5854 ft.
Top PZ Location:Sec:14 Twp: 7S 96WFootage: 192 FNL  2098 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96WFootage: 192 FNL  2098 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1350 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1350 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6291 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 2400 ft., Bottom: 6291 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1251 ft.NN
MESAVERDE3208 ft.NN
CAMEO5760 ft.NN
ROLLINS6227 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/1/2008                 Interval Top: 4784 ft.    Interval Bottom: 6148 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/6/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/4/2008
Treatment Summary:2464 GALS 7 1/2% HCL; 631400# 30/50 SAND; 16497 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5653 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 1608
MCF_GAS 1089
TUBING_PRESS 1329
Perforation Data:
Interval Top:4784 ft.# Of Holes:96
Interval Bottom:6148 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)26
Total Gas Produced (MCF)18714
GOR719769
GOR DeterminationMCFE
Average BOE per Day8.908
Average MCFE per Day51.682

 Federal Financial Assurance  i Y

 Tribal Well  i No