Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15239
Well Classification: GW Status: PR - 8/31/2008
Well Name/No:PUCKETT #SG 341-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/31/2008
FacilityID:109LocationID:334568
County:GARFIELD #045Location:SESE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5088 ft.
Basin:PICEANCE BASIN  
Planned Location:364FSL  734 FELLat/Long: 39.431273 / -108.070552Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.431272 / -108.070558Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/31/2008             Measured TD: 5750 ft.    Vertical TD: 5642 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20076104 Expiration Date:1/27/2009
Proposed Top PZ Location:Sec: Twp: Footage: 372 FNL  390 FEL
Bottom Hole Location:Sec:23 Twp: 7S 96W Footage: 372 FNL  390 FEL
Proposed Depth/Form:5693 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:5/16/2008
Spud Date:5/9/2008Spud Date Is:ACTUAL
Measured TD:5750 ft.Measured PB depth:5650 ft.
True Vertical TD:5642 ft.True Vertical PB depth:5542 ft.
Top PZ Location:Sec:23 Twp: 7S 96WFootage: 378 FNL  354 FEL
Bottom Hole Location:Sec:23 Twp: 7S 96WFootage: 378 FNL  354 FEL
Log Types:CBL; RMTE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1129 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 1129 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5718 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 721, Top: 2090 ft., Bottom: 5718 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G889 ft.NN
MESAVERDE2721 ft.NN
CAMEO5123 ft.NN
ROLLINS5589 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/31/2008                 Interval Top: 4005 ft.    Interval Bottom: 5538 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/24/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2008
Treatment Summary:1,126,300# 30/50 SAND; 28,974 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5338 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2008Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1503
CASING_PRESS 1430
MCF_GAS 1315
TUBING_PRESS 1331
Perforation Data:
Interval Top:4005 ft.# Of Holes:130
Interval Bottom:5538 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)12842
GOR611523
GOR DeterminationMCFE
Average BOE per Day6.121
Average MCFE per Day35.484

 Federal Financial Assurance  i 

 Tribal Well  i No