Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14894
Well Classification: GW Status: PR - 1/1/2026
Well Name/No:M DUTTON #7-24C (SGV 7N)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:293140LocationID:334127
County:GARFIELD #045Location:SWSW 7 8S95W 6
Field:PARACHUTE - #67350Elevation:6122 ft.
Basin:PICEANCE BASIN  
Planned Location:917FSL  1243 FWLLat/Long: 39.373135 / -108.044010Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.373135 / -108.044009Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2026             Measured TD: 7065 ft.    Vertical TD: 6896 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20074683 Expiration Date:10/24/2008
Proposed Top PZ Location:Sec: Twp: Footage: 475 FSL  2296 FWL
Bottom Hole Location:Sec:7 Twp: 8S 95W Footage: 475 FSL  2296 FWL
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-51 , Unit Acreage: 49, Drill Unit: SESW
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-45 , Unit Acreage: 49, Drill Unit: SESW

Wellbore Completed
Completion Date:5/12/2008
Spud Date:4/13/2008Spud Date Is:ACTUAL
Measured TD:7065 ft.Measured PB depth:7016 ft.
True Vertical TD:6896 ft.True Vertical PB depth:6847 ft.
Top PZ Location:Sec:7 Twp: 8S 95WFootage: 484 FSL  2291 FWL
Bottom Hole Location:Sec:7 Twp: 8S 95WFootage: 484 FSL  2291 FWL
Log Types:CBL, RMTE
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: 0 ft., Bottom: 104 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1553 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1553 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7067 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 655, Top: 3620 ft., Bottom: 7067 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3363 ft.NN
CAMEO5886 ft.NN
ROLLINS6217 ft.NN
COZZETTE6514 ft.NN
CORCORAN6752 ft.NN
MANCOS6866 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 11/1/2025                 Interval Top: 6774 ft.    Interval Bottom: 6821 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/26/2008Choke Size:0.344 in.
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/14/2008
Treatment Summary:378 GALS 7.5% HCL; 741 BBLS 2% KCL; 411 SKS 30/50 SAND; 45 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:6629 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 39
BTU_GAS 976
CALC_BBLS_H2O 39
CALC_MCF_GAS 148
CASING_PRESS 1250
MCF_GAS 148
TUBING_PRESS 800
Perforation Data:
Interval Top:6774 ft.# Of Holes:11
Interval Bottom:6821 ft.Hole Size:0.34 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 6676 ft.    Interval Bottom: 6732 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/26/2008Choke Size:0.344 in.
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/14/2008
Treatment Summary:FRAC - 378 GALS 7.5% HCL; 739 BBLS 2% KCL; 415 SKS 30/50 SAND; 43 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:6629 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 26
BTU_GAS 976
CALC_BBLS_H2O 26
CALC_MCF_GAS 96
CASING_PRESS 1250
MCF_GAS 96
TUBING_PRESS 800
Perforation Data:
Interval Top:6676 ft.# Of Holes:13
Interval Bottom:6732 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 4814 ft.    Interval Bottom: 6156 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/26/2008Choke Size:0.344 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/19/2008
Treatment Summary:FRAC - 3823 GALS 7.5% HCL; 6545 BBLS 2% KCL; 3004 SKS 30/50 SAND; 343 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:6629 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 219
BTU_GAS 976
CALC_BBLS_H2O 219
CALC_MCF_GAS 816
CASING_PRESS 1250
MCF_GAS 816
TUBING_PRESS 800
Perforation Data:
Interval Top:4814 ft.# Of Holes:120
Interval Bottom:6156 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)9
Total Gas Produced (MCF)10375
GOR1152777
GOR DeterminationMCFE
Average BOE per Day4.921
Average MCFE per Day28.536

 Federal Financial Assurance  i Y

 Tribal Well  i No