Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14893
Well Classification: GW Status: SI - 11/1/2025
Well Name/No:M DUTTON #7-24D (SGV 7N)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:293138LocationID:334127
County:GARFIELD #045Location:SWSW 7 8S95W 6
Field:PARACHUTE - #67350Elevation:6122 ft.
Basin:PICEANCE BASIN  
Planned Location:909FSL  1244 FWLLat/Long: 39.373113 / -108.044005Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.373113 / -108.044004Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2025             Measured TD: 7156 ft.    Vertical TD: 6954 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20074684 Expiration Date:10/24/2008
Proposed Top PZ Location:Sec: Twp: Footage: 145 FSL  2300 FWL
Bottom Hole Location:Sec:7 Twp: 8S 95W Footage: 145 FSL  2300 FWL
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-51 , Unit Acreage: 49, Drill Unit: SESW
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-45 , Unit Acreage: 49, Drill Unit: SESW

Wellbore Completed
Completion Date:5/8/2008
Spud Date:4/17/2008Spud Date Is:ACTUAL
Measured TD:7156 ft.Measured PB depth:7055 ft.
True Vertical TD:6954 ft.True Vertical PB depth:6853 ft.
Top PZ Location:Sec:7 Twp: 8S 95WFootage: 164 FSL  2258 FWL
Bottom Hole Location:Sec:7 Twp: 8S 95WFootage: 164 FSL  2258 FWL
Log Types:CBL, RMTE
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 84 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 84 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1553 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1553 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7106 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 3480 ft., Bottom: 7106 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3373 ft.NN
CAMEO5904 ft.NN
ROLLINS6230 ft.NN
COZZETTE6530 ft.NN
CORCORAN6769 ft.NN
MANCOS6882 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 11/1/2025                 Interval Top: 6786 ft.    Interval Bottom: 6834 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/26/2008Choke Size:0.375 in.
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/14/2008
Treatment Summary:FRAC - 375 GALS 7.5% HCL; 709 BBLS 2% KCL; 380 SKS 30/50 SAND
Tubing Size:2.375 in.Tubing Setting Depth:6643 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BTU_GAS 964
CALC_BBLS_H2O 14
CALC_MCF_GAS 49
CASING_PRESS 1200
MCF_GAS 49
TUBING_PRESS 800
Perforation Data:
Interval Top:6786 ft.# Of Holes:12
Interval Bottom:6834 ft.Hole Size:0.34 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 6692 ft.    Interval Bottom: 6748 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/26/2008Choke Size:0.375 in.
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/14/2008
Treatment Summary:FRAC - 375 GALS 7.5% HCL; 754 BBLS 2% KCL; 370 SKS 30/50 SAND; 47 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:6643 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 39
BTU_GAS 964
CALC_BBLS_H2O 39
CALC_MCF_GAS 147
CASING_PRESS 1200
MCF_GAS 147
TUBING_PRESS 800
Perforation Data:
Interval Top:6692 ft.# Of Holes:12
Interval Bottom:6748 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 4751 ft.    Interval Bottom: 6171 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/26/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/19/2008
Treatment Summary:FRAC - 4518 GALS 7.5% HCL; 6997 BBLS 2% KCL; 2815 SKS 30/50 SAND; 739 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:6643 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 210
BTU_GAS 964
CALC_BBLS_H2O 210
CALC_MCF_GAS 785
CASING_PRESS 1200
MCF_GAS 785
TUBING_PRESS 800
Perforation Data:
Interval Top:4751 ft.# Of Holes:144
Interval Bottom:6171 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)12
GOR12000
GOR DeterminationBOE
Average BOE per Day0.008
Average MCFE per Day0.048

 Federal Financial Assurance  i Y

 Tribal Well  i No