Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14860
Well Classification: GW Status: PR - 8/4/2017
Well Name/No:Puckett #32C-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/4/2017
FacilityID:293063LocationID:335512
County:GARFIELD #045Location:NWNE 23 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8535 ft.
Basin:PICEANCE BASIN  
Planned Location:301FNL  1830 FELLat/Long: 39.514900 / -108.184550Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.514900 / -108.184550Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/23/2017
End Date: 7/25/2017
Reported: 7/31/2017
Days to report: 6
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/4/2017             Measured TD: 9403 ft.    Vertical TD: 9115 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/4/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/4/2018
Proposed Top PZ Location:Sec:23 Twp: 6S 97W Footage: 2220 FNL  2416 FEL
Bottom Hole Location:Sec:23 Twp: 6S 97W Footage: 2220 FNL  2416 FEL
Proposed Depth/Form:9442 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 829, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9442 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 871, Top: 4446 ft., Bottom: 9442 ft.

Wellbore Completed
Completion Date:10/18/2016
Spud Date:10/12/2016Spud Date Is:ACTUAL
Measured TD:9403 ft.Measured PB depth:9352 ft.
True Vertical TD:9115 ft.True Vertical PB depth:9064 ft.
Top PZ Location:Sec:23 Twp: 6S 97WFootage: 2157 FNL  2249 FEL
Bottom Hole Location:Sec:23 Twp: 6S 97WFootage: 2193 FNL  2339 FEL
Log Types:CBL, PNL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2529 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 0 ft., Bottom: 2529 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9359 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 941, Top: 4591 ft., Bottom: 9359 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH2751 ft.NN
WASATCH G4786 ft.NN
FORT UNION5087 ft.NN
OHIO CREEK6369 ft.NN
WILLIAMS FORK6595 ft.NN
CAMEO8794 ft.NN
ROLLINS9243 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/4/2017                  Interval Top: 7407 ft.    Interval Bottom: 9175 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/4/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/23/2017Treatment End Date:7/25/2017
Treatment Summary:Frac'd with 56,000 bbls slickwater and 130 bbls 7.5% HCl acid.
Total fluid used in treatment (bbls):56000Max pressure during treatment (psi):8317
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):130Min frac gradient (psi/ft):0.45
Recycled water used in treatment (bbls):48350Total flowback volume recovered (bbls):28075
Fresh water used in treatment (bbls):7520Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8931 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/4/2017Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1765
BTU_GAS 1080
CALC_BBLS_H2O 1765
CALC_MCF_GAS 1401
CASING_PRESS 575
MCF_GAS 1401
Perforation Data:
Interval Top:7407 ft.# Of Holes:189
Interval Bottom:9175 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)119
Total Gas Produced (MCF)61513
GOR516915
GOR DeterminationMCFE
Average BOE per Day29.423
Average MCFE per Day170.617

 Federal Financial Assurance  i 

 Tribal Well  i No