Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14855
Well Classification: GW Status: PR - 7/18/2017
Well Name/No:Puckett #31B-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/18/2017
FacilityID:293058LocationID:335512
County:GARFIELD #045Location:NWNE 23 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8535 ft.
Basin:PICEANCE BASIN  
Planned Location:249FNL  1830 FELLat/Long: 39.515044 / -108.184547Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.515044 / -108.184547Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/5/2017
End Date: 7/9/2017
Reported: 7/31/2017
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/18/2017             Measured TD: 9183 ft.    Vertical TD: 9154 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/18/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/4/2018
Proposed Top PZ Location:Sec:23 Twp: 6S 97W Footage: 387 FNL  2480 FEL
Bottom Hole Location:Sec:23 Twp: 6S 97W Footage: 387 FNL  2480 FEL
Proposed Depth/Form:9189 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 829, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9189 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 820, Top: 4465 ft., Bottom: 9189 ft.

Wellbore Completed
Completion Date:9/18/2016
Spud Date:9/12/2016Spud Date Is:ACTUAL
Measured TD:9183 ft.Measured PB depth:9146 ft.
True Vertical TD:9154 ft.True Vertical PB depth:9116 ft.
Top PZ Location:Sec:23 Twp: 6S 97WFootage: 332 FNL  2398 FEL
Bottom Hole Location:Sec:23 Twp: 6S 97WFootage: 379 FNL  2491 FEL
Log Types:PNL, CBL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2523 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 866, Top: 0 ft., Bottom: 2523 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9160 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 941, Top: 3851 ft., Bottom: 9160 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: , Depth: , Bottom: , Sacks: 340, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH2723 ft.NN
WASATCH G4644 ft.NN
FORT UNION4914 ft.NN
OHIO CREEK6161 ft.NN
WILLIAMS FORK6375 ft.NN
CAMEO8633 ft.NN
ROLLINS9069 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/18/2017                 Interval Top: 7202 ft.    Interval Bottom: 8968 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/18/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/5/2017Treatment End Date:7/9/2017
Treatment Summary:Frac'd with 56,000 bbls slickwater and 149 bbls 7.5% HCl acid.
Total fluid used in treatment (bbls):56000Max pressure during treatment (psi):8251
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):149Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):56851Total flowback volume recovered (bbls):31556
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8782 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/18/2017Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2167
BTU_GAS 1067
CALC_BBLS_H2O 2167
CALC_MCF_GAS 346
CASING_PRESS 580
MCF_GAS 346
Perforation Data:
Interval Top:7202 ft.# Of Holes:189
Interval Bottom:8968 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)137
Total Gas Produced (MCF)64594
GOR471489
GOR DeterminationMCFE
Average BOE per Day30.894
Average MCFE per Day179.153

 Federal Financial Assurance  i 

 Tribal Well  i No