Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14853
Well Classification: GW Status: PR - 12/25/2008
Well Name/No:FEDERAL #PA 32-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date12/25/2008
FacilityID:293055LocationID:335414
County:GARFIELD #045Location:SENE 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5388 ft.
Basin:PICEANCE BASIN  
Planned Location:2192FNL  650 FELLat/Long: 39.482097 / -108.033408Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.482093 / -108.033407Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/25/2008             Measured TD: 7355 ft.    Vertical TD: 6960 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/25/2008
Wellbore PermitDIRECTIONAL
Permit #:20074637 Expiration Date:10/18/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1621 FNL  2317 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95W Footage: 1679 FNL  2358 FEL
Proposed Depth/Form:7388 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:7/30/2008
Spud Date:7/18/2008Spud Date Is:ACTUAL
Measured TD:7355 ft.Measured PB depth:7270 ft.
True Vertical TD:6960 ft.True Vertical PB depth:6875 ft.
Top PZ Location:Sec:31 Twp: 6S 95WFootage: 1639 FNL  2343 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95WFootage: 1639 FNL  2343 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2023 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 2023 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7337 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 841, Top: 2850 ft., Bottom: 7337 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE4070 ft.NN
CAMEO6632 ft.NN
ROLLINS7211 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/25/2008                Interval Top: 5410 ft.    Interval Bottom: 7105 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/4/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/2/2008
Treatment Summary:3053 GALS 7 1/2% HCL; 820100 20/40 SAND; 22433 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6372 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/25/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_GOR 0
CASING_PRESS 780
MCF_GAS 1103
TUBING_PRESS 620
Perforation Data:
Interval Top:5410 ft.# Of Holes:127
Interval Bottom:7105 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)14522
GOR631391
GOR DeterminationMCFE
Average BOE per Day6.927
Average MCFE per Day40.163

 Federal Financial Assurance  i Y

 Tribal Well  i No