Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14836
Well Classification: GW Status: PR - 10/31/2008
Well Name/No:FEDERAL #PA 413-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date10/31/2008
FacilityID:293020LocationID:334826
County:GARFIELD #045Location:SESW 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5561 ft.
Basin:PICEANCE BASIN  
Planned Location:623FSL  1231 FWLLat/Long: 39.475832 / -108.044351Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.475833 / -108.044356Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/31/2008             Measured TD: 7518 ft.    Vertical TD: 7112 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20074627 Expiration Date:10/16/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2347 FSL  769 FWL
Bottom Hole Location:Sec:31 Twp: 6S 95W Footage: 2347 FSL  769 FWL
Proposed Depth/Form:7552 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:6/20/2008
Spud Date:6/13/2008Spud Date Is:ACTUAL
Measured TD:7518 ft.Measured PB depth:7409 ft.
True Vertical TD:7112 ft.True Vertical PB depth:7003 ft.
Top PZ Location:Sec:31 Twp: 6S 95WFootage: 2366 FSL  596 FWL
Bottom Hole Location:Sec:31 Twp: 6S 95WFootage: 2366 FSL  596 FWL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2313 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 495, Top: 0 ft., Bottom: 2313 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7504 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 836, Top: 4064 ft., Bottom: 7504 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1901 ft.NN
MESAVERDE4201 ft.NN
CAMEO6816 ft.NN
ROLLINS7373 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/31/2008                Interval Top: 5380 ft.    Interval Bottom: 7252 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/13/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2008
Treatment Summary:3500 GALS 7 1/2% HCL; 8373100 20/10 SAND; 24492 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6780 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1170
CALC_GOR 0
CALC_MCF_GAS 1021
CASING_PRESS 1443
MCF_GAS 1021
TUBING_PRESS 1247
Perforation Data:
Interval Top:5380 ft.# Of Holes:129
Interval Bottom:7252 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)2116
GOR
GOR DeterminationMCFE
Average BOE per Day1.003
Average MCFE per Day5.800

 Federal Financial Assurance  i Y

 Tribal Well  i No