Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14543
Well Classification: GW Status: PA - 8/6/2020
Well Name/No:N. Parachute #CP05B-3 H04 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/6/2020
FacilityID:291928LocationID:335907
County:GARFIELD #045Location:SENE 4 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8273 ft.
Basin:PICEANCE BASIN  
Planned Location:2141FNL  99 FELLat/Long: 39.645442 / -108.165182Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.645440 / -108.165182Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/6/2020             Measured TD: 11200 ft.    Vertical TD: 11152 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/6/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/12/2014
Proposed Top PZ Location:Sec:3 Twp: 5S 96W Footage: 1655 FNL  352 FWL
Bottom Hole Location:Sec:3 Twp: 5S 96W Footage: 1659 FNL  101 FWL
Proposed Depth/Form:11200 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/28/2008
Spud Date:9/16/2007Spud Date Is:ACTUAL
Measured TD:11200 ft.Measured PB depth:6675 ft.
True Vertical TD:11152 ft.True Vertical PB depth:6627 ft.
Top PZ Location:Sec:3 Twp: 5S 96WFootage: 1655 FNL  352 FWL
Bottom Hole Location:Sec:3 Twp: 5S 96WFootage: 1659 FNL  101 FWL
Log Types:GR, RST, GR-CCL, MUDLOG, PLATFORM EXPRESS, CBL/TEMP, SONIC
Log Types:Platform express, GR, RST, GR-CCL were submitted by ConocoPhillips Company in 2008. CBL on 4/20/2012 see uploaded .LAS and Attachment .PDF
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 97 ft., Weight: 40# , Citings Type: ACTUAL
Cement:Sacks: 45, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2019 ft., Weight: 36# , Citings Type: ACTUAL
Cement:Sacks: 1108, Top: 0 ft., Bottom: 2019 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7758 ft., Weight: 23# , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 1819 ft., Bottom: 7758 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7030 ft., Depth: 11174 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 304, Top: 5232 ft., Bottom: 11174 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2059 ft.7000 ft.
OHIO CREEK7001 ft.7254 ft.
WILLIAMS FORK7255 ft.10984 ft.
ROLLINS10985 ft.11199 ft.

Formation WSTC                     Formation Classification:  GW                     Status:  AB - 8/6/2020                  Interval Top: 6729 ft.    Interval Bottom: 7001 ft.

 Completed Information for Formation WASATCH
1st Production Date:N/AChoke Size: 
Formation Name:WASATCHCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/22/2012
Treatment Summary:On 4/5/12 a CIPB was set @ 7190' in 4 1/2" casg, pumped 20xs cmt on top of CIBP, then cut off 4 1/2" at 7030 and pulled . Then set CIBP at 6675' in 7" csg and put 2 sxs sand on top. This well was never completed with any formation treatmentit was however Perf'd and tested for injectivity. Due to budget changes it was determined to stop any further completion activities on this well for re-evaluation.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WSTC.
Perforation Data:
Interval Top:6729 ft.# Of Holes:50
Interval Bottom:7001 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/06/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No