|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/6/2020 Measured TD: 11200 ft. Vertical TD: 11152 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/6/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/12/2014 | | Proposed Top PZ Location: | Sec:3 Twp: 5S 96W | Footage: 1655 FNL 352 FWL | | Bottom Hole Location: | Sec:3 Twp: 5S 96W | Footage: 1659 FNL 101 FWL | | Proposed Depth/Form: | 11200 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/28/2008 | | Spud Date: | 9/16/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 11200 ft. | Measured PB depth: | 6675 ft. | | True Vertical TD: | 11152 ft. | True Vertical PB depth: | 6627 ft. | | Top PZ Location: | Sec:3 Twp: 5S 96W | Footage: 1655 FNL 352 FWL | | Bottom Hole Location: | Sec:3 Twp: 5S 96W | Footage: 1659 FNL 101 FWL | | Log Types: | GR, RST, GR-CCL, MUDLOG, PLATFORM EXPRESS, CBL/TEMP, SONIC | | Log Types: | Platform express, GR, RST, GR-CCL were submitted by ConocoPhillips Company in 2008.
CBL on 4/20/2012 see uploaded .LAS and Attachment .PDF | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 97 ft., Weight: 40# , Citings Type: ACTUAL | | Cement: | Sacks: 45, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2019 ft., Weight: 36# , Citings Type: ACTUAL | | Cement: | Sacks: 1108, Top: 0 ft., Bottom: 2019 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7758 ft., Weight: 23# , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 1819 ft., Bottom: 7758 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7030 ft., Depth: 11174 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 304, Top: 5232 ft., Bottom: 11174 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 2059 ft. | 7000 ft. | | | | OHIO CREEK | 7001 ft. | 7254 ft. | | | | WILLIAMS FORK | 7255 ft. | 10984 ft. | | | | ROLLINS | 10985 ft. | 11199 ft. | | |
Formation WSTC Formation Classification: GW Status: AB - 8/6/2020 Interval Top: 6729 ft. Interval Bottom: 7001 ft.| Completed Information for Formation WASATCH | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WASATCH | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/22/2012 | | Treatment Summary: | On 4/5/12 a CIPB was set @ 7190' in 4 1/2" casg, pumped 20xs cmt on top of CIBP, then cut off 4 1/2" at 7030 and pulled . Then set CIBP at 6675' in 7" csg and put 2 sxs sand on top. This well was never completed with any formation treatmentit was however Perf'd and tested for injectivity. Due to budget changes it was determined to stop any further completion activities on this well for re-evaluation. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WSTC. |
| | Perforation Data: | | Interval Top: | 6729 ft. | # Of Holes: | 50 | | Interval Bottom: | 7001 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/06/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|