Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14513
Well Classification: GW Status: PR - 11/26/2007
Well Name/No:FEDERAL #PA 513-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date11/26/2007
FacilityID:291714LocationID:335389
County:GARFIELD #045Location:NESE 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5737 ft.
Basin:PICEANCE BASIN  
Planned Location:1633FSL  540 FELLat/Long: 39.492720 / -108.014380Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/26/2007             Measured TD: 7820 ft.    Vertical TD: 7751 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/26/2007
Wellbore PermitDIRECTIONAL
Permit #:20073291 Expiration Date:8/2/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1789 FSL  245 FWL
Bottom Hole Location:Sec:28 Twp: 6S 95W Footage: 1789 FSL  245 FWL
Proposed Depth/Form:7804 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:11/2/2007
Spud Date:10/15/2007Spud Date Is:ACTUAL
Measured TD:7820 ft.Measured PB depth:7773 ft.
True Vertical TD:7751 ft.True Vertical PB depth:
Top PZ Location:Sec:28 Twp: 6S 95WFootage: 1793 FSL  240 FWL
Bottom Hole Location:Sec:28 Twp: 6S 95WFootage: 1793 FSL  240 FWL
Log Types:CBL; HIGH RES.INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2317 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 607, Top: 0 ft., Bottom: 2317 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7807 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1028, Top: 2770 ft., Bottom: 7807 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2074 ft.NN
WILLIAMS FORK4299 ft.NN
CAMEO7103 ft.NN
ROLLINS7696 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/9/1972                 Interval Top: 5414 ft.    Interval Bottom: 7573 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/26/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/13/2007
Treatment Summary:3500 GALS 7.5% HCL; 939,200# 30/50 SAND; 22,378 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7024 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/9/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1063
CASING_PRESS 1604
MCF_GAS 1481
TUBING_PRESS 1308
Perforation Data:
Interval Top:5414 ft.# Of Holes:133
Interval Bottom:7573 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)34
Total Gas Produced (MCF)17097
GOR502852
GOR DeterminationMCFE
Average BOE per Day8.172
Average MCFE per Day47.383

 Federal Financial Assurance  i Y

 Tribal Well  i No