Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14458
Well Classification: GW Status: PR - 4/21/2008
Well Name/No:DIAMOND ELK #PA 513-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC53630
Facility Status:PRStatus Date4/21/2008
FacilityID:291581LocationID:335008
County:GARFIELD #045Location:NWSW 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6023 ft.
Basin:PICEANCE BASIN  
Planned Location:2159FSL  618 FWLLat/Long: 39.465622 / -107.954190Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465619 / -107.954185Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/21/2008             Measured TD: 7950 ft.    Vertical TD: 7869 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/21/2008
Wellbore PermitDIRECTIONAL
Permit #:20082705 Expiration Date:7/1/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1269 FSL  732 FWL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 1269 FSL  732 FWL
Proposed Depth/Form:8021 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:9/16/2008
Spud Date:9/7/2008Spud Date Is:ACTUAL
Measured TD:7950 ft.Measured PB depth:7883 ft.
True Vertical TD:7869 ft.True Vertical PB depth:7802 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 1283 FSL  755 FWL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 1283 FSL  755 FWL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1116 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 1116 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7929 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 907, Top: 2870 ft., Bottom: 7929 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2249 ft.NN
MESAVERDE4507 ft.NN
CAMEO6868 ft.NN
ROLLINS7841 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/5/2009                  Interval Top: 5796 ft.    Interval Bottom: 7749 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/17/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/29/2008
Treatment Summary:3563 GALS 7.5% HCL; 909,550# 30/50 SAND; 24,485 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7417 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/5/2009Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1050
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 740
GRAVITY_OIL 52
MCF_GAS 702
TUBING_PRESS 512
Perforation Data:
Interval Top:5796 ft.# Of Holes:133
Interval Bottom:7749 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)13971
GOR665285
GOR DeterminationMCFE
Average BOE per Day6.661
Average MCFE per Day38.640

 Federal Financial Assurance  i 

 Tribal Well  i No