Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14375
Well Classification: GW Status: PR - 7/18/2007
Well Name/No:FEDERAL #GM 342-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 27874
Facility Status:PRStatus Date7/18/2007
FacilityID:291449LocationID:334735
County:GARFIELD #045Location:SENE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5146 ft.
Basin:PICEANCE BASIN  
Planned Location:2385FNL  474 FELLat/Long: 39.438271 / -108.069729Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.438272 / -108.069729Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/18/2007             Measured TD: 6107 ft.    Vertical TD: 5907 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/18/2007
Wellbore PermitDIRECTIONAL
Permit #:20072785 Expiration Date:7/17/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1409 FNL  1124 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96W Footage: 1409 FNL  1124 FEL
Proposed Depth/Form:6063 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/16/2007
Spud Date:11/8/2007Spud Date Is:ACTUAL
Measured TD:6107 ft.Measured PB depth:6019 ft.
True Vertical TD:5907 ft.True Vertical PB depth:5819 ft.
Top PZ Location:Sec:14 Twp: 7S 96WFootage: 1415 FNL  1132 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96WFootage: 1415 FNL  1132 FEL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1159 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1159 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6082 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 831, Top: 1840 ft., Bottom: 6082 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1019 ft.NN
MESAVERDE2990 ft.NN
CAMEO5484 ft.NN
ROLLINS5950 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/7/2008                  Interval Top: 4340 ft.    Interval Bottom: 5888 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/10/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/26/2007
Treatment Summary:3048 GALS 7.5% HCL; 767,300# 30/50 SAND; 21,452 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5552 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1097
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1280
MCF_GAS 1254
TUBING_PRESS 1206
Perforation Data:
Interval Top:4340 ft.# Of Holes:100
Interval Bottom:5888 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)12858
GOR857200
GOR DeterminationMCFE
Average BOE per Day6.104
Average MCFE per Day35.393

 Federal Financial Assurance  i Y

 Tribal Well  i No