Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14292
Well Classification: GW Status: PR - 3/1/2019
Well Name/No:CHEVRON #24A-7D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2019
FacilityID:291076LocationID:335798
County:GARFIELD #045Location:NWSW 7 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6361 ft.
Basin:PICEANCE BASIN  
Planned Location:2224FSL  1084 FWLLat/Long: 39.536236 / -108.155611Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.536250 / -108.155610Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2019             Measured TD: 8010 ft.    Vertical TD: 7774 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/3/2010
Proposed Top PZ Location:Sec:7 Twp: 6S 96W Footage: 1271 FSL  1975 FWL
Bottom Hole Location:Sec:7 Twp: 6S 96W Footage: 1249 FSL  2000 FWL
Proposed Depth/Form:8080 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-11 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 100 ft., Weight: 84 , Citings Type: PLANNED
Cement:Sacks: 100, Top: , Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 2800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 900, Top: , Bottom: 2800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7980 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 740, Top: 4149 ft., Bottom: 7980 ft.

Wellbore Completed
Completion Date:5/22/2010
Spud Date:5/13/2010Spud Date Is:ACTUAL
Measured TD:8010 ft.Measured PB depth:7820 ft.
True Vertical TD:7774 ft.True Vertical PB depth:7584 ft.
Top PZ Location:Sec:7 Twp: 6S 96WFootage: 1281 FSL  2015 FWL
Bottom Hole Location:Sec:7 Twp: 6S 96WFootage: 1272 FSL  1983 FWL
Log Types:PNDL/GR, PND-S CASED HOLE TRIPLE COMBO, CBL/GR
Casing:String Type: CONDUCTOR, Hole Size: 32 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 3074 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 784, Top: 0 ft., Bottom: 3074 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7982 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 3510 ft., Bottom: 7982 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2907 ft.
FORT UNION3275 ft.
WILLIAMS FORK4676 ft.
CAMEO7412 ft.
ROLLINS7799 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2019                  Interval Top: 6284 ft.    Interval Bottom: 7616 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/1/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/1/2010
Treatment Summary:FRAC'D USING 16078 BBLS OF SLICKWATER GEL AND 584635 LBS OF 30/50 MESH WHITE SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7469 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/1/2010Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 31
BBLS_OIL 2
BTU_GAS 1077
CALC_BBLS_H2O 31
CALC_BBLS_OIL 2
CALC_GOR 413000
CALC_MCF_GAS 826
CASING_PRESS 380
GRAVITY_OIL 49
MCF_GAS 826
TUBING_PRESS 222
Perforation Data:
Interval Top:6284 ft.# Of Holes:132
Interval Bottom:7616 ft.Hole Size:0.31 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)17532
GOR604551
GOR DeterminationMCFE
Average BOE per Day8.370
Average MCFE per Day48.523

 Federal Financial Assurance  i 

 Tribal Well  i No