Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14278
Well Classification: GW Status: PR - 6/14/2007
Well Name/No:DIAMOND ELK #PA 41-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/14/2007
FacilityID:291062LocationID:334706
County:GARFIELD #045Location:SWNE 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6108 ft.
Basin:PICEANCE BASIN  
Planned Location:1485FNL  1309 FELLat/Long: 39.469860 / -107.942380Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.469858 / -107.942385Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/7/2007             Measured TD: 8570 ft.    Vertical TD: 8373 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/7/2007
Wellbore PermitDIRECTIONAL
Permit #:20072512 Expiration Date:6/13/2008
Proposed Top PZ Location:Sec: Twp: Footage: 139 FNL  692 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 139 FNL  692 FEL
Proposed Depth/Form:8694 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/21/2008
Spud Date:3/9/2008Spud Date Is:ACTUAL
Measured TD:8570 ft.Measured PB depth:8520 ft.
True Vertical TD:8373 ft.True Vertical PB depth:8323 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 107 FNL  704 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 107 FNL  704 FEL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2867 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 628, Top: 0 ft., Bottom: 2867 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8551 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 993, Top: 3510 ft., Bottom: 8551 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2542 ft.NN
MESAVERDE5023 ft.NN
CAMEO7573 ft.NN
ROLLINS8518 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/29/2008                 Interval Top: 6437 ft.    Interval Bottom: 8433 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/11/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/2008
Treatment Summary:3508 GALS 7.5% HCL; 751,947# 20/40 SAND; 26,524 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7830 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/29/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1035
CASING_PRESS 2074
MCF_GAS 1323
TUBING_PRESS 1924
Perforation Data:
Interval Top:6437 ft.# Of Holes:134
Interval Bottom:8433 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)21164
GOR783851
GOR DeterminationMCFE
Average BOE per Day10.076
Average MCFE per Day58.443

 Federal Financial Assurance  i 

 Tribal Well  i No