Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14260
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:N.PARACHUTE #EF 12B G29 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:291027LocationID:335573
County:GARFIELD #045Location:SWNE 29 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6101 ft.
Planned Location:2238FNL  1474 FELLat/Long: 39.585922 / -108.073878Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.585922 / -108.073887Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 9878 ft.    Vertical TD: 9545 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20072299 Expiration Date:6/11/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2310 FSL  330 FWL
Bottom Hole Location:Sec:28 Twp: 5S 95W Footage: 2310 FSL  330 FWL
Proposed Depth/Form:12398 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/11/2008
Spud Date:11/15/2007Spud Date Is:ACTUAL
Measured TD:9878 ft.Measured PB depth:9827 ft.
True Vertical TD:9545 ft.True Vertical PB depth:9494 ft.
Top PZ Location:Sec:28 Twp: 5S 95WFootage: 2293 FSL  262 FWL
Bottom Hole Location:Sec:28 Twp: 5S 95WFootage: 2293 FSL  262 FWL
Log Types:MUD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2526 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 2526 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9872 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1416, Top: 2980 ft., Bottom: 9872 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6059 ft.9738 ft.NN
ROLLINS9739 ft.9878 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 6232 ft.    Interval Bottom: 9691 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/19/2008Choke Size:0.280 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/26/2008
Treatment Summary:STAGES 01-10 TREATED WITH A TOTAL OF: 44977 BBLS OF SLICKWATER, 506000 LBS 30-50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8334 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 1019
CASING_PRESS 1300
MCF_GAS 1019
TUBING_PRESS 650
Perforation Data:
Interval Top:6232 ft.# Of Holes:300
Interval Bottom:9691 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13
GOR
GOR DeterminationMCFE
Average BOE per Day0.006
Average MCFE per Day0.036

 Federal Financial Assurance  i 

 Tribal Well  i No