Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14093
Well Classification: GW Status: PR - 3/1/2012
Well Name/No:SHELL #TR 11-5-697
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2012
FacilityID:290375LocationID:324409
County:GARFIELD #045Location:NWNW 5 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8492 ft.
Basin:PICEANCE BASIN  
Planned Location:996FNL  1019 FWLLat/Long: 39.560070 / -108.249270Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.560070 / -108.249280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2012             Measured TD: 9064 ft.    Vertical TD: 8640 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2012
Wellbore PermitDIRECTIONAL
Permit #:20071428 Expiration Date:4/24/2008
Proposed Top PZ Location:Sec: Twp: Footage: 176 FNL  401 FWL
Bottom Hole Location:Sec:5 Twp: 6S 97W Footage: 176 FNL  401 FWL
Proposed Depth/Form:9054 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/24/2007
Spud Date:8/11/2007Spud Date Is:ACTUAL
Measured TD:9064 ft.Measured PB depth:9037 ft.
True Vertical TD:8640 ft.True Vertical PB depth:8613 ft.
Top PZ Location:Sec:5 Twp: 6S 97WFootage: 175 FNL  400 FEL
Bottom Hole Location:Sec:5 Twp: 6S 97WFootage: 175 FNL  400 FEL
Log Types:CBL, MUD, RMTE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2710 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1407, Top: 0 ft., Bottom: 2710 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9064 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 4340 ft., Bottom: 9064 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6026 ft.NN
CAMEO8432 ft.NN
ROLLINS8837 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2012                  Interval Top: 7235 ft.    Interval Bottom: 8798 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/17/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/17/2007
Treatment Summary:294,000 GALS 10% HCI ACID; 703,000# 30/50 SAND; 18,335 BBLS SLICKWATER; 229 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:8363 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1053
CALC_BBLS_OIL 0
CALC_GOR 0
CASING_PRESS 1650
MCF_GAS 1907
TUBING_PRESS 1350
Perforation Data:
Interval Top:7235 ft.# Of Holes:154
Interval Bottom:8798 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)82
Total Gas Produced (MCF)39122
GOR477097
GOR DeterminationMCFE
Average BOE per Day18.722
Average MCFE per Day108.588

 Federal Financial Assurance  i 

 Tribal Well  i No