|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 5650 ft. Vertical TD: 5596 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20092627 | Expiration Date: | 9/11/2011 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 594 FSL 2259 FEL | | Bottom Hole Location: | Sec:2 Twp: 8S 96W | Footage: 594 FSL 2259 FEL | | Proposed Depth/Form: | 6227 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 139-51 , Unit Acreage: 40, Drill Unit: SWSE | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-45 , Unit Acreage: 40, Drill Unit: SWSE | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 60 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 7 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6227 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: , Bottom: 6227 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/2/2010 | | Spud Date: | 10/29/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 5650 ft. | Measured PB depth: | 5578 ft. | | True Vertical TD: | 5596 ft. | True Vertical PB depth: | 5524 ft. | | Top PZ Location: | Sec:2 Twp: 8S 96W | Footage: 534 FSL 2219 FEL | | Bottom Hole Location: | Sec:2 Twp: 8S 96W | Footage: 581 FSL 2242 FEL | | Log Types: | RCBL/CCL/GR/RMTE | | Casing: | String Type: CONDUCTOR, Hole Size: 19 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: linepipe , Citings Type: ACTUAL | | Cement: | Sacks: 15, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1530 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 344, Top: 0 ft., Bottom: 1530 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5640 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 562, Top: 2272 ft., Bottom: 5640 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 2674 ft. | | | | | CAMEO | 5045 ft. | | | | | ROLLINS | 5452 ft. | | | |
Formation WFCM Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 4131 ft. Interval Bottom: 5412 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/15/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/7/2010 | | Treatment Summary: | 4500 gal 7.5% HCL; 358,659 gal 2% KCL, 3,700 sacks Ottawa, 1,014 sacks SB Excel |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5231 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/18/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 158 | | BTU_GAS | 933 | | CALC_BBLS_H2O | 158 | | CALC_MCF_GAS | 616 | | CASING_PRESS | 930 | | MCF_GAS | 616 | | TUBING_PRESS | 600 |
| | Perforation Data: | | Interval Top: | 4131 ft. | # Of Holes: | 135 | | Interval Bottom: | 5412 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 43 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.020 |
| Average MCFE per Day | 0.124 |
| Federal Financial Assurance | i | |
|
|