Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14058
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:HYRUP #2-44D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:290255LocationID:334103
County:GARFIELD #045Location:SWSE 2 8S96W 6
Field:GRAND VALLEY - #31290Elevation:5748 ft.
Basin:PICEANCE BASIN  
Planned Location:351FSL  1647 FELLat/Long: 39.372930 / -108.072940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.372935 / -108.072942Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 6360 ft.    Vertical TD: 6204 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20071333 Expiration Date:4/17/2008
Proposed Top PZ Location:Sec:2 Twp: 8S 96W Footage: 139 FSL  688 FEL
Bottom Hole Location:Sec:2 Twp: 8S 96W Footage: 139 FSL  688 FEL
Proposed Depth/Form:6346 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-51 , Unit Acreage: 40, Drill Unit: SESE
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-45 , Unit Acreage: 40, Drill Unit: SESE

Wellbore Completed
Completion Date:1/15/2008
Spud Date:1/8/2008Spud Date Is:ACTUAL
Measured TD:6360 ft.Measured PB depth:6295 ft.
True Vertical TD:6204 ft.True Vertical PB depth:6139 ft.
Top PZ Location:Sec:2 Twp: 8S 96WFootage: 139 FSL  688 FEL
Bottom Hole Location:Sec:2 Twp: 8S 96WFootage: 139 FSL  688 FEL
Log Types:CBL, RMT
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 78 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 78 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1502 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 1502 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6342 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 775, Top: 3450 ft., Bottom: 6360 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK2852 ft.NN
CAMEO5177 ft.NN
ROLLINS5604 ft.NN
COZZETTE5868 ft.NN
CORCORAN6095 ft.NN
MANCOS6203 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 5/1/2025                  Interval Top: 6126 ft.    Interval Bottom: 6199 ft.

 Completed Information for Formation CORCORAN
1st Production Date:4/3/2008Choke Size:0.313 in.
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/28/2008
Treatment Summary:CZ-CR - 750 GAL 7.5% HCL ACID; 1,088 BBLS 2% KCL FRESH WATER; 640 SX 30/50 SAND; 56 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:5981 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 60
BTU_GAS 1297
CALC_BBLS_H2O 60
CALC_MCF_GAS 36
CASING_PRESS 1140
MCF_GAS 36
TUBING_PRESS 800
Perforation Data:
Interval Top:6126 ft.# Of Holes:15
Interval Bottom:6199 ft.Hole Size:0.34 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 4/1/2022                  Interval Top: 6040 ft.    Interval Bottom: 6045 ft.

 Completed Information for Formation COZZETTE
1st Production Date:4/3/2008Choke Size:0.313 in.
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/28/2008
Treatment Summary:CZ-CR - 750 GAL 7.5% HCL ACID; 1,088 BBLS 2% KCL FRESH WATER; 640 SX 30/50 SAND & 56 TONS CO2.
Tubing Size:2.375 in.Tubing Setting Depth:5981 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BTU_GAS 1297
CALC_BBLS_H2O 18
CALC_MCF_GAS 11
CASING_PRESS 1140
MCF_GAS 11
TUBING_PRESS 800
Perforation Data:
Interval Top:6040 ft.# Of Holes:5
Interval Bottom:6045 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 4160 ft.    Interval Bottom: 5477 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/3/2008Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/29/2008
Treatment Summary:4,500 GAL 7.5% HCL ACID; 8,717 BBLS 2% KCL FRESH WATER; 4,377 SX 30/50 SAND; 415 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:5981 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 522
BTU_GAS 1297
CALC_BBLS_H2O 522
CALC_MCF_GAS 315
CASING_PRESS 1140
MCF_GAS 315
TUBING_PRESS 800
Perforation Data:
Interval Top:4160 ft.# Of Holes:144
Interval Bottom:5477 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.019

 Federal Financial Assurance  i 

 Tribal Well  i No