Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14001
Well Classification: GW Status: PR - 11/30/2008
Well Name/No:CLOUGH #RWF 412-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC34798
Facility Status:PRStatus Date11/30/2008
FacilityID:290120LocationID:335688
County:GARFIELD #045Location:SENE 14 6S94W 6
Field:RULISON - #75400Elevation:5385 ft.
Basin:PICEANCE BASIN  
Planned Location:1803FNL  684 FELLat/Long: 39.527594 / -107.848930Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.527592 / -107.848939Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/30/2008             Measured TD: 8585 ft.    Vertical TD: 8348 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20080507 Expiration Date:3/23/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2105 FNL  738 FWL
Bottom Hole Location:Sec:13 Twp: 6S 94W Footage: 2105 FNL  738 FWL
Proposed Depth/Form:8503 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-14 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:6/28/2008
Spud Date:6/14/2008Spud Date Is:ACTUAL
Measured TD:8585 ft.Measured PB depth:8426 ft.
True Vertical TD:8348 ft.True Vertical PB depth:
Top PZ Location:Sec:13 Twp: 6S 94WFootage: 2117 FNL  874 FWL
Bottom Hole Location:Sec:13 Twp: 6S 94WFootage: 2117 FNL  874 FWL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2315 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 2315 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8560 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1325, Top: 4075 ft., Bottom: 8560 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2004 ft.NN
MESAVERDE4663 ft.NN
CAMEO7627 ft.NN
ROLLINS8526 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2008                Interval Top: 6327 ft.    Interval Bottom: 8244 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/24/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/22/2008
Treatment Summary:3000 GALS 7.5% HCL; 641,000# 20/40 SAND; 18,590 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7802 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_MCF_GAS 757
CASING_PRESS 627
MCF_GAS 757
TUBING_PRESS 341
Perforation Data:
Interval Top:6327 ft.# Of Holes:115
Interval Bottom:8244 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)54
Total Gas Produced (MCF)12560
GOR232592
GOR DeterminationMCFE
Average BOE per Day6.073
Average MCFE per Day35.213

 Federal Financial Assurance  i 

 Tribal Well  i No