Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13979
Well Classification: DSPW Status: IJ - 9/1/2025
Well Name/No:WILLIAMS #GM 523-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date9/1/2025
FacilityID:290103LocationID:334947
County:GARFIELD #045Location:SESW 36 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5448 ft.
Basin:PICEANCE BASIN  
Planned Location:1125FSL  1630 FWLLat/Long: 39.476390 / -108.060910Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476389 / -108.060918Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: IJ - 9/1/2025             Measured TD: 6840 ft.    Vertical TD: 6831 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        IJ - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20090963 Expiration Date:4/29/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1350 FSL  1684 FWL
Bottom Hole Location:Sec:36 Twp: 6S 96W Footage: 1350 FSL  1684 FWL
Proposed Depth/Form:6840 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-13 , Unit Acreage: 160, Drill Unit: SW4
Casing:String Type: CONDUCTOR, Hole Size: 18 in., Size: 24 in., Top: , Depth: 45 ft., Weight: 18 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1112 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 325, Top: 0 ft., Bottom: 1112 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6828 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 845, Top: 2200 ft., Bottom: 6828 ft.

Wellbore Completed
Completion Date:5/21/2007
Spud Date:5/12/2007Spud Date Is:ACTUAL
Measured TD:6840 ft.Measured PB depth:6803 ft.
True Vertical TD:6831 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1350 FSL  1684 FWL
Bottom Hole Location:Sec:36 Twp: 6S 96WFootage: 1350 FSL  1684 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/ DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1112 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1112 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6828 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 2325 ft., Bottom: 6828 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1813 ft.NN
FORT UNION2070 ft.NN
MESAVERDE3693 ft.NN
CAMEO6243 ft.NN
ROLLINS6733 ft.NN

Formation WFCM                     Formation Classification:  DSPW                     Status:  IJ - 9/1/2025                  Interval Top: 4942 ft.    Interval Bottom: 6649 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/14/2007Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/9/2007
Treatment Summary:3636 GAL 7 1/2% HCL; 1044100# 30/50 SAND; 37670 BBL SLICKWATER (SUMMARY)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1351
MCF_GAS 607
TUBING_PRESS 1017
Perforation Data:
Interval Top:4942 ft.# Of Holes:141
Interval Bottom:6649 ft.Hole Size:0.35 in.

Formation MVRD                     Formation Classification:  DSPW                     Status:  IJ - 9/1/2025                  Interval Top: 3700 ft.    Interval Bottom: 4706 ft.

 Completed Information for Formation MESAVERDE
1st Production Date:5/8/2009Choke Size: 
Formation Name:MESAVERDECommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/17/2009
Treatment Summary:INJUECTION ZONE PRESSURE TEST 4/22/09 2144 PSI 3747 GALS 7 1/2% HCL; 909564# 20/40 SAND; 34466 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.875 in.Tubing Setting Depth:3689 ft.
Tubing Packer Depth:3689 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MVRD.
Perforation Data:
Interval Top:3700 ft.# Of Holes:84
Interval Bottom:4706 ft.Hole Size:0.35 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
09/30/2024
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No