Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13775
Well Classification: GW Status: PR - 2/28/2007
Well Name/No:CHEVRON #GM 431-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/28/2007
FacilityID:289527LocationID:335654
County:GARFIELD #045Location:NWNE 17 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5599 ft.
Basin:PICEANCE BASIN  
Planned Location:781FNL  2278 FELLat/Long: 39.529561 / -108.130107Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.529564 / -108.130101Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/22/2007             Measured TD: 7220 ft.    Vertical TD: 7183 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/22/2007
Wellbore PermitDIRECTIONAL
Permit #:20070360 Expiration Date:2/27/2008
Proposed Top PZ Location:Sec: Twp: Footage: 485 FNL  1858 FEL
Bottom Hole Location:Sec:17 Twp: 6S 96W Footage: 485 FNL  1858 FEL
Proposed Depth/Form:7263 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:6/19/2007
Spud Date:6/10/2007Spud Date Is:ACTUAL
Measured TD:7220 ft.Measured PB depth:7159 ft.
True Vertical TD:7183 ft.True Vertical PB depth:
Top PZ Location:Sec:17 Twp: 6S 96WFootage: 487 FNL  1763 FEL
Bottom Hole Location:Sec:17 Twp: 6S 96WFootage: 487 FNL  1763 FEL
Log Types:CBL;RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1118 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1118 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7207 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 883, Top: 2080 ft., Bottom: 7207 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2154 ft.NN
MESAVERDE3918 ft.NN
CAMEO6625 ft.NN
ROLLINS7101 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/21/2007                 Interval Top: 5375 ft.    Interval Bottom: 6994 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/5/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/3/2007
Treatment Summary:3798 GAL 7 1/2% HCL; 937800# 30/50 SAND; 41497 BBL SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6507 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/21/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1927
MCF_GAS 1236
TUBING_PRESS 1813
Perforation Data:
Interval Top:5375 ft.# Of Holes:130
Interval Bottom:6994 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)11878
GOR625157
GOR DeterminationMCFE
Average BOE per Day5.662
Average MCFE per Day32.834

 Federal Financial Assurance  i 

 Tribal Well  i No