Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13644
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:LATHAM #29-25D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:289025LocationID:335836
County:GARFIELD #045Location:SWSE 29 5S96W 6
Field:GRAND VALLEY - #31290Elevation:7919 ft.
Basin:PICEANCE BASIN  
Planned Location:359FSL  2318 FELLat/Long: 39.579868 / -108.191705Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.579875 / -108.191706Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 9703 ft.    Vertical TD: 9676 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20075817 Expiration Date:12/3/2008
Proposed Top PZ Location:Sec: Twp: Footage: 200 FSL  2300 FEL
Bottom Hole Location:Sec:29 Twp: 5S 96W Footage: 200 FSL  2300 FEL
Proposed Depth/Form:9545 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:8/3/2008
Spud Date:7/20/2008Spud Date Is:ACTUAL
Measured TD:9703 ft.Measured PB depth:9628 ft.
True Vertical TD:9676 ft.True Vertical PB depth:9601 ft.
Top PZ Location:Sec:29 Twp: 5S 96WFootage: 215 FSL  1796 FEL
Bottom Hole Location:Sec:29 Twp: 5S 96WFootage: 215 FSL  1796 FEL
Log Types:RST, FES, CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 120 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2338 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1522, Top: 0 ft., Bottom: 2338 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9673 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 801, Top: 2500 ft., Bottom: 9673 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK6397 ft.NN
WILLIAMS FORK6657 ft.NN
CAMEO9097 ft.NN
ROLLINS9472 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 7252 ft.    Interval Bottom: 9339 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:11/11/2008Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/20/2010
Treatment Summary:11/7/2008 - Frac stages 1-3 Stage 1 - 9,124'-9,339' @ 2 spf (20 holes total) using 78,020 lbs 20/40 white sand and 2,271 bbls slickwater fluid. Led with 750 gal. 7.5% acid. Stage 2 - 8,913'-9,067' @ 2 spf (20 holes total) using 70,672 lbs 20/40 white sand and 2,226 bbls slickwater fluid. Led with 750 gal. 7.5% acid. Stage 3 - 8,555'-8,715; @ 2 spf (20 holes total) using 72,714 lbs 20/40 white sand and 2,049 bbls slickwater fluid. Led with 750 gal 7.5% acid. 2/20/2010 - Frac stages 4-7 Stage 4 - 8,309'-8,458' @ 2 spf (30 holes total) using 86,773 lbs 30/50 white sand and 6,742 bbls slickwater fluid. Led with 500 gal. 7.5% acid. Stage 5 - 8,013-8,271' @ 2 spf (30 holes total) using 159,506 lbs 30/50 white sand and 12,608 bbls slickwater fluid. Led with 500 gal. 7.5% acid. Stage 6 - 7,769'-7,979' @ 2 spf (30 holes total) using 86,429 lbs 30/50 white sand and 6,802 bbls slickwater fluid. Led with 500 gal. 7.5% acid. Stage 7 - 7,503'-7,727' @ 2 spf (30 holes total) using 146,787 lbs 30/50 white sand and 11,352 bbls slickwater fluid. Led with 500 gal. 7.5% acid. 3/2/2010 - Perf stage 8 Stage 8 - 7,252'-7,460' @ 2 spf (30 Holes)
Formation Treatment
Treatment Date:11/3/2008
Treatment Summary:WELL FRAC'D IN 3 STAGES USING 6613 BBLS SLICKWATER AND 221406 LBS 20/40 WHITE SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/7/2010Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 298
BTU_GAS 1065
CALC_BBLS_H2O 298
CALC_MCF_GAS 2900
CASING_PRESS 1240
MCF_GAS 2900
Perforation Data:
Interval Top:7252 ft.# Of Holes:210
Interval Bottom:9339 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.022

 Federal Financial Assurance  i 

 Tribal Well  i No