Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13524
Well Classification: GW Status: PR - 7/31/2005
Well Name/No:PA #22-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date7/31/2005
FacilityID:275333LocationID:334965
County:GARFIELD #045Location:SENW 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5156 ft.
Basin:PICEANCE BASIN  
Planned Location:1904FNL  1986 FWLLat/Long: 39.468899 / -108.041864Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.468766 / -108.042163Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2005             Measured TD: 6500 ft.    Vertical TD: 6465 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2005
Wellbore PermitDIRECTIONAL
Permit #:20050474 Expiration Date:3/6/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1415 FNL  1786 FWL
Bottom Hole Location:Sec: Twp: Footage: 1415 FNL  1786 FWL
Proposed Depth/Form:6604 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-39,440, Unit Acreage: 160, Drill Unit: NW/4
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: 440-1 , Unit Acreage: 160, Drill Unit: NW/4

Wellbore Completed
Completion Date:4/21/2005
Spud Date:3/18/2005Spud Date Is:ACTUAL
Measured TD:6500 ft.Measured PB depth:6410 ft.
True Vertical TD:6465 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1415 FNL  1786 FWL
Bottom Hole Location:Sec: Twp: Footage: 1415 FNL  1786 FWL
Log Types:HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON; CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 922 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 922 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6485 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 2340 ft., Bottom: 6485 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1600 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 900 ft., Bottom: 1600 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
WASATCH G1445 ft.NN
FORT UNION1761 ft.NN
MESAVERDE3442 ft.NN
CAMEO5965 ft.NN
ROLLINS6474 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2005                 Interval Top: 3940 ft.    Interval Bottom: 6303 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/21/2005
Treatment Summary:4000 GALS 7-1/2% HCL, 662700# 30/50, 13500 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:3816 ft.
Tubing Packer Depth:1619 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 527
TUBING_PRESS 680
Perforation Data:
Interval Top:3940 ft.# Of Holes:90
Interval Bottom:6303 ft.Hole Size:0.34 in.

Formation WSTC                     Formation Classification:  GW                     Status:  PR - 7/25/2005                 Interval Top: 1129 ft.    Interval Bottom: 1498 ft.

 Completed Information for Formation WASATCH
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WASATCHCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/21/2005
Treatment Summary:500 GALS 7-1/2% HCL, 255100# 30/50, 1034 BBLS DELTA 20# AND 4% KCL BASE FLUID, 672519# N2
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:1619 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 535
TUBING_PRESS 699
Perforation Data:
Interval Top:1129 ft.# Of Holes:14
Interval Bottom:1498 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)20952
GOR873000
GOR DeterminationMCFE
Average BOE per Day9.960
Average MCFE per Day57.790

 Federal Financial Assurance  i 

 Tribal Well  i No