Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13464
Well Classification: GW Status: PR - 3/1/2019
Well Name/No:CHEVRON #42D-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2019
FacilityID:275070LocationID:324399
County:GARFIELD #045Location:SENE 8 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5629 ft.
Basin:PICEANCE BASIN  
Planned Location:2609FNL  650 FELLat/Long: 39.539527 / -108.123557Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.539580 / -108.123530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2019             Measured TD: 7535 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2019
Wellbore Permit
Permit #:20042833 Expiration Date:12/7/2005
Proposed Depth/Form:7800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/9/2005
Spud Date:1/29/2005Spud Date Is:ACTUAL
Measured TD:7535 ft.Measured PB depth:7326 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DENSITY, COMPENSATED NEUTRON, ARRAY INDUCTION, GAMMA RAY, CBL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 44 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2623 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 2623 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7326 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 4980 ft., Bottom: 7326 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2183 ft.NN
FORT UNION2693 ft.NN
WILLIAMS FORK4116 ft.NN
CAMEO6930 ft.NN
ROLLINS7461 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2019                  Interval Top: 5911 ft.    Interval Bottom: 7031 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/9/2005
Treatment Summary:3/9/05 B J SERVICES PERFORMED AN HYDRO FRAC WITH 3035 BBL OF LIGHTING 18 - 22# GEL SYSTEM USING 332639# OF 20/40 FRAC SAND AND 10570# OF RESIN COATED MSE 14/30 MESH SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7055 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 1
BTU_GAS 1052
CALC_BBLS_H2O 3
CALC_BBLS_OIL 1
CALC_GOR 282000
CALC_MCF_GAS 282
CASING_PRESS 2950
GRAVITY_OIL 56
MCF_GAS 282
TUBING_PRESS 2900
Perforation Data:
Interval Top:5911 ft.# Of Holes:50
Interval Bottom:7031 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)8780
GOR462105
GOR DeterminationMCFE
Average BOE per Day4.213
Average MCFE per Day24.433

 Federal Financial Assurance  i 

 Tribal Well  i No