Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13414
Well Classification: GW Status: PR - 8/29/2005
Well Name/No:PA #421-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC67447
Facility Status:PRStatus Date8/29/2005
FacilityID:274840LocationID:335229
County:GARFIELD #045Location:NENW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5604 ft.
Basin:PICEANCE BASIN  
Planned Location:1103FNL  1968 FWLLat/Long: 39.499419 / -108.005343Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.499466 / -108.005309Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/29/2005             Measured TD: 7855 ft.    Vertical TD: 7805 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/29/2005
Wellbore PermitDIRECTIONAL
Permit #:20042662 Expiration Date:11/22/2005
Proposed Top PZ Location:Sec: Twp: Footage: 458 FNL  1975 FWL
Bottom Hole Location:Sec: Twp: Footage: 458 FNL  1975 FWL
Proposed Depth/Form:7946 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:7/12/2005
Spud Date:5/4/2005Spud Date Is:ACTUAL
Measured TD:7855 ft.Measured PB depth:7830 ft.
True Vertical TD:7805 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 458 FNL  1975 FWL
Bottom Hole Location:Sec: Twp: Footage: 458 FNL  1975 FWL
Log Types:HIGH RESOULTION INDUCTION,SPECTRAL DENSITY,DUAL SPACED NEUTRON; CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2356 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 2356 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7854 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 3240 ft., Bottom: 7854 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2172 ft.NN
FORT UNION2522 ft.NN
MESAVERDE4426 ft.NN
CAMEO7136 ft.NN
ROLLINS7829 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/29/2005                 Interval Top: 5634 ft.    Interval Bottom: 7705 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/12/2005
Treatment Summary:4754 GALS 71/2% HCL, 788900# 30/50, 19123 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1034
CASING_PRESS 1854
MCF_GAS 1034
TUBING_PRESS 1680
Perforation Data:
Interval Top:5634 ft.# Of Holes:150
Interval Bottom:7705 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)8296
GOR395047
GOR DeterminationMCFE
Average BOE per Day3.973
Average MCFE per Day23.076

 Federal Financial Assurance  i 

 Tribal Well  i No