Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13402
Well Classification: GW Status: PR - 5/27/2005
Well Name/No:PA #321-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/27/2005
FacilityID:274804LocationID:335287
County:GARFIELD #045Location:NENW 33 6S95W 6
Field:PARACHUTE - #67350Elevation:5529 ft.
Basin:PICEANCE BASIN  
Planned Location:763FNL  2244 FWLLat/Long: 39.486169 / -108.004653Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.486186 / -108.004629Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/27/2005             Measured TD: 7311 ft.    Vertical TD: 7304 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/27/2005
Wellbore PermitDIRECTIONAL
Permit #:20042648 Expiration Date:11/21/2005
Proposed Top PZ Location:Sec: Twp: Footage: 692 FNL  2071 FWL
Bottom Hole Location:Sec: Twp: Footage: 692 FNL  2071 FWL
Proposed Depth/Form:7414 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: NW/4

Wellbore Completed
Completion Date:4/21/2005
Spud Date:3/19/2005Spud Date Is:ACTUAL
Measured TD:7311 ft.Measured PB depth:7240 ft.
True Vertical TD:7304 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 692 FNL  2071 FWL
Bottom Hole Location:Sec: Twp: Footage: 692 FNL  2071 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1981 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1981 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7299 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1027, Top: 3270 ft., Bottom: 7299 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1780 ft.NN
FORT UNION2038 ft.NN
MESAVERDE3939 ft.NN
CAMEO6558 ft.NN
ROLLINS7264 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/27/2005                 Interval Top: 5171 ft.    Interval Bottom: 7186 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/21/2005
Treatment Summary:4500 GALS 7 1/2% HCL, 743000# 30/50, 15505 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6927 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 917
CASING_PRESS 1378
MCF_GAS 917
TUBING_PRESS 1179
Perforation Data:
Interval Top:5171 ft.# Of Holes:108
Interval Bottom:7186 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)10190
GOR849166
GOR DeterminationMCFE
Average BOE per Day4.845
Average MCFE per Day28.119

 Federal Financial Assurance  i 

 Tribal Well  i No