Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13394
Well Classification: GW Status: PR - 3/4/2005
Well Name/No:PA #443-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/4/2005
FacilityID:274812LocationID:335411
County:GARFIELD #045Location:SENE 33 6S95W 6
Field:PARACHUTE - #67350Elevation:5356 ft.
Basin:PICEANCE BASIN  
Planned Location:2451FNL  964 FELLat/Long: 39.481519 / -107.997243Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.481600 / -107.997196Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/4/2005             Measured TD: 7142 ft.    Vertical TD: 7076 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/4/2005
Wellbore PermitDIRECTIONAL
Permit #:20042623 Expiration Date:11/21/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2558 FSL  341 FEL
Bottom Hole Location:Sec: Twp: Footage: 2558 FSL  341 FEL
Proposed Depth/Form:7254 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:2/26/2005
Spud Date:12/26/2004Spud Date Is:ACTUAL
Measured TD:7142 ft.Measured PB depth:7100 ft.
True Vertical TD:7076 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2558 FSL  341 FEL
Bottom Hole Location:Sec: Twp: Footage: 2558 FSL  341 FEL
Log Types:HIGH RESOLUTION INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1778 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 0 ft., Bottom: 1777 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7130 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 898, Top: 3470 ft., Bottom: 7129 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH1572 ft.NN
FORT UNION1861 ft.NN
MESAVERDE3797 ft.NN
CAMEO6431 ft.NN
ROLLINS7117 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/4/2005                  Interval Top: 5170 ft.    Interval Bottom: 7024 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2005
Treatment Summary:4000 GALS 7 1/2% HCL, 510800# 30/50 SAND, 17115 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6720 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/4/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 861
CASING_PRESS 1062
MCF_GAS 861
TUBING_PRESS 915
Perforation Data:
Interval Top:5170 ft.# Of Holes:85
Interval Bottom:7024 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)15028
GOR751400
GOR DeterminationMCFE
Average BOE per Day7.153
Average MCFE per Day41.503

 Federal Financial Assurance  i 

 Tribal Well  i No