Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13363
Well Classification: GW Status: PR - 3/1/2022
Well Name/No:WILLIAMS PRODUCTION RMT #GM 433-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 51005
Facility Status:PRStatus Date3/1/2022
FacilityID:274588LocationID:335240
County:GARFIELD #045Location:NESE 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6123 ft.
Basin:PICEANCE BASIN  
Planned Location:1954FSL  1283 FELLat/Long: 39.478458 / -108.127177Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.478599 / -108.127134Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2022             Measured TD: 7021 ft.    Vertical TD: 6996 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2022
Wellbore PermitDIRECTIONAL
Permit #:20042477 Expiration Date:11/8/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1588 FSL  1573 FEL
Bottom Hole Location:Sec: Twp: Footage: 1588 FSL  1573 FEL
Proposed Depth/Form:7084 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:5/13/2005
Spud Date:4/12/2005Spud Date Is:ACTUAL
Measured TD:7021 ft.Measured PB depth:6964 ft.
True Vertical TD:6996 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1588 FSL  1573 FEL
Bottom Hole Location:Sec: Twp: Footage: 1588 FSL  1573 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1115 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1115 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7005 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 4650 ft., Bottom: 7005 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2371 ft.NN
FORT UNION2682 ft.NN
MESAVERDE3913 ft.NN
CAMEO6417 ft.NN
ROLLINS6918 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2022                  Interval Top: 5268 ft.    Interval Bottom: 6580 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/13/2005
Treatment Summary:3250 GALS 7 1/2% HCL, 548600# 30/50, 11017 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6340 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/20/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1193
CASING_PRESS 1043
MCF_GAS 1193
TUBING_PRESS 949
Perforation Data:
Interval Top:5268 ft.# Of Holes:75
Interval Bottom:6580 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)7021
GOR540076
GOR DeterminationMCFE
Average BOE per Day3.351
Average MCFE per Day19.451

 Federal Financial Assurance  i 

 Tribal Well  i No