Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13326
Well Classification: GW Status: SI - 8/1/2025
Well Name/No:PUCKETT #12C-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:274075LocationID:324389
County:GARFIELD #045Location:SWNW 25 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8373 ft.
Basin:PICEANCE BASIN  
Planned Location:2140FNL  727 FWLLat/Long: 39.495348 / -108.175399Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.495386 / -108.175502Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2025             Measured TD: 9200 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2025
Wellbore Permit
Permit #:20042182 Expiration Date:10/7/2005
Proposed Depth/Form:9300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9050 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1100, Top: 2975 ft., Bottom: 9050 ft.

Wellbore Completed
Completion Date:12/2/2004
Spud Date:6/8/2005Spud Date Is:ACTUAL
Measured TD:9200 ft.Measured PB depth:9014 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED NEUTRON, GAMMA RAY, DIPOLE SONIC, CCL, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 44 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2665 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 2665 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9014 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4834 ft., Bottom: 9014 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4438 ft.NN
FORT UNION4733 ft.NN
WILLIAMS FORK6234 ft.NN
CAMEO8440 ft.NN
ROLLINS8867 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 8/1/2025                  Interval Top: 6906 ft.    Interval Bottom: 8592 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2004
Treatment Summary:8/13-15/05 BJ SERVICES PERFORMED AN GELLED WATER FRAC WITH 6854 BBL OF LIGHTING 22# GEL SYSTEM USING 615,712# OF 20/40 FRAC SAND AND 150,000# OF RESIN COATED MSE 14/30 MESH SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8383 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/1/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 0
BTU_GAS 1080
CALC_GOR 138000
CASING_PRESS 900
MCF_GAS 138
TUBING_PRESS 780
Perforation Data:
Interval Top:6906 ft.# Of Holes:102
Interval Bottom:8592 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13
GOR
GOR DeterminationMCFE
Average BOE per Day0.005
Average MCFE per Day0.035

 Federal Financial Assurance  i 

 Tribal Well  i No