Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13129
Well Classification: GW Status: PR - 11/17/2006
Well Name/No:CHEVRON #GM 14-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC23794
Facility Status:PRStatus Date11/17/2006
FacilityID:287991LocationID:335183
County:GARFIELD #045Location:SESW 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5724 ft.
Basin:PICEANCE BASIN  
Planned Location:282FSL  1495 FWLLat/Long: 39.503170 / -108.136540Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.503175 / -108.136544Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/4/2006             Measured TD: 7071 ft.    Vertical TD: 6978 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/4/2006
Wellbore PermitDIRECTIONAL
Permit #:20065165 Expiration Date:11/16/2007
Proposed Top PZ Location:Sec: Twp: Footage: 454 FSL  543 FWL
Bottom Hole Location:Sec:20 Twp: 6S 96W Footage: 454 FSL  543 FWL
Proposed Depth/Form:7039 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:3/26/2007
Spud Date:3/17/2007Spud Date Is:ACTUAL
Measured TD:7071 ft.Measured PB depth:7032 ft.
True Vertical TD:6978 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 96WFootage: 452 FNL  547 FWL
Bottom Hole Location:Sec:20 Twp: 6S 96WFootage: 452 FNL  547 FWL
Log Types:CBL; HIGH RESOLUTION IND, SPECTRAL DENS, DUAL SPACED NEU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1145 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1145 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7057 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 868, Top: 2770 ft., Bottom: 7057 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2149 ft.NN
MESAVERDE3860 ft.NN
CAMEO6404 ft.NN
ROLLINS6901 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/15/2007                 Interval Top: 5173 ft.    Interval Bottom: 6786 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/16/2007Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/2007
Treatment Summary:3018 GALS 7 1/2% HCL, 704,700# 30/50 SAND, 21804 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6300 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1486
MCF_GAS 1400
TUBING_PRESS 1368
Perforation Data:
Interval Top:5173 ft.# Of Holes:107
Interval Bottom:6786 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)47
Total Gas Produced (MCF)22815
GOR485425
GOR DeterminationMCFE
Average BOE per Day10.906
Average MCFE per Day63.246

 Federal Financial Assurance  i Y

 Tribal Well  i No