Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13045
Well Classification: GW Status: PR - 11/13/2006
Well Name/No:FEDERAL #GM 513-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27743
Facility Status:PRStatus Date11/13/2006
FacilityID:287840LocationID:335097
County:GARFIELD #045Location:SWSW 25 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5985 ft.
Planned Location:768FSL  819 FWLLat/Long: 39.488900 / -108.064452Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.488897 / -108.064446Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/25/2006             Measured TD: 7888 ft.    Vertical TD: 7607 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/25/2006
Wellbore PermitDIRECTIONAL
Permit #:20064925 Expiration Date:11/12/2007
Proposed Depth/Form:7903 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:5/7/2007
Spud Date:4/29/2007Spud Date Is:ACTUAL
Measured TD:7888 ft.Measured PB depth:7849 ft.
True Vertical TD:7607 ft.True Vertical PB depth:
Top PZ Location:Sec:25 Twp: 6S 96WFootage: 2474 FSL  845 FWL
Bottom Hole Location:Sec:25 Twp: 6S 96WFootage: 2474 S  845 W
Log Types:CBL;HIGH RESOLUTION INDUCTION,SPECTRAL DENSITY,DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 1128 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7886 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 863, Top: 1106 ft., Bottom: 7886 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2340 ft.NN
WILLIAMS FORK4614 ft.NN
CAMEO7190 ft.NN
ROLLINS7797 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/29/2008                 Interval Top: 6023 ft.    Interval Bottom: 7604 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/11/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/2/2007
Treatment Summary:2519 GAL 7 1/2% HCL; 773640# 30/50 SAND; 28128 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7146 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/29/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1036
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 949
GRAVITY_OIL 56
MCF_GAS 935
TUBING_PRESS 767
Perforation Data:
Interval Top:6023 ft.# Of Holes:90
Interval Bottom:7604 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)17503
GOR530393
GOR DeterminationMCFE
Average BOE per Day8.342
Average MCFE per Day48.390

 Federal Financial Assurance  i Y

 Tribal Well  i No