Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12951
Well Classification: GW Status: PR - 10/5/2006
Well Name/No:PA #312-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/5/2006
FacilityID:287291LocationID:334627
County:GARFIELD #045Location:NWNW 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5162 ft.
Basin:PICEANCE BASIN  
Planned Location:692FNL  640 FWLLat/Long: 39.472010 / -108.028820Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.472015 / -108.028830Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/25/2006             Measured TD: 6722 ft.    Vertical TD: 6586 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/25/2006
Wellbore PermitDIRECTIONAL
Permit #:20064398 Expiration Date:10/4/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1681 FNL  418 FWL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 1681 FNL  418 FWL
Proposed Depth/Form:6720 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:3/21/2007
Spud Date:3/10/2007Spud Date Is:ACTUAL
Measured TD:6722 ft.Measured PB depth:6655 ft.
True Vertical TD:6586 ft.True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 1678 FNL  425 FWL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 1678 FNL  425 FWL
Log Types:CBL; HIGH RES INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1629 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 432, Top: 0 ft., Bottom: 1629 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6696 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 926, Top: 3200 ft., Bottom: 6696 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1373 ft.NN
MESAVERDE3473 ft.NN
CAMEO6049 ft.NN
ROLLINS6570 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/8/2007                  Interval Top: 4873 ft.    Interval Bottom: 6509 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/3/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2007
Treatment Summary:3000 GALS 7 1/2% HCL; 746,500# 30/50 SAND; 17,641 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6194 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/8/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1480
MCF_GAS 1143
TUBING_PRESS 1380
Perforation Data:
Interval Top:4873 ft.# Of Holes:122
Interval Bottom:6509 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)21330
GOR688064
GOR DeterminationMCFE
Average BOE per Day10.162
Average MCFE per Day58.930

 Federal Financial Assurance  i 

 Tribal Well  i No