Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12948
Well Classification: GW Status: PR - 10/5/2006
Well Name/No:PA #512-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/5/2006
FacilityID:287294LocationID:334627
County:GARFIELD #045Location:NWNW 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5162 ft.
Basin:PICEANCE BASIN  
Planned Location:700FNL  627 FWLLat/Long: 39.471990 / -108.028870Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471994 / -108.028877Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/25/2006             Measured TD: 6938 ft.    Vertical TD: 6564 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/25/2006
Wellbore PermitDIRECTIONAL
Permit #:20064396 Expiration Date:10/4/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2376 FNL  178 FWL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 2376 FNL  178 FWL
Proposed Depth/Form:6928 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/26/2007
Spud Date:2/15/2007Spud Date Is:ACTUAL
Measured TD:6938 ft.Measured PB depth:6875 ft.
True Vertical TD:6564 ft.True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 2379 FNL  191 FWL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 2379 FNL  191 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1713 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 455, Top: 0 ft., Bottom: 1713 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6905 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 928, Top: 2100 ft., Bottom: 6905 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1448 ft.NN
MESAVERDE3683 ft.NN
CAMEO6281 ft.NN
ROLLINS6803 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/6/2007                  Interval Top: 4936 ft.    Interval Bottom: 6715 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/3/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2007
Treatment Summary:3000 GALS 7 1/2% HCL; 726,600# 30/50 SAND; 17,576 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6183 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1500
MCF_GAS 1218
TUBING_PRESS 1460
Perforation Data:
Interval Top:4936 ft.# Of Holes:109
Interval Bottom:6715 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)18177
GOR727080
GOR DeterminationMCFE
Average BOE per Day8.665
Average MCFE per Day50.250

 Federal Financial Assurance  i 

 Tribal Well  i No