|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DA Status: AB - 3/19/2008 Measured TD: 6086 ft. Vertical TD: 6086 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DA AB - 3/19/2008 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20074197 | Expiration Date: | 10/10/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 835 FNL 450 FEL | | Bottom Hole Location: | Sec:10 Twp: 6S 96W | Footage: 835 FNL 450 FEL | | Proposed Depth/Form: | 10785 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: , Depth: 90 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1100, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 10785 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 6500 ft., Bottom: 10785 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/19/2008 | | Spud Date: | 3/11/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 6086 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 6086 ft. | True Vertical PB depth: | 0 ft. | | Bottom Hole Location: | Sec:10 Twp: 6S 96W | Footage: 835 FNL 450 FEL | | Log Types: | No logs run | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: , Depth: 120 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 120 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: , Size: 9.625 in., Top: , Depth: 3172 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1720, Top: 0 ft., Bottom: 3172 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: , Depth: 6086 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | 4424 ft. | | | | WASATCH | 4424 ft. | 5434 ft. | | | | FORT UNION | 5434 ft. | 7144 ft. | | | | OHIO CREEK | 7144 ft. | 7604 ft. | | | | MESAVERDE | 7604 ft. | 10029 ft. | | | | CAMEO | 10029 ft. | 10529 ft. | | | | ROLLINS | 10529 ft. | | | | | No formation data to display. |
|
|
|
|
|
|
| Reported Plugged | Y | 09/07/2011 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|